Geotechnical Report <br /> Proposed Storage Building <br /> 106th Street SW and Airport Road <br /> Everett, Washington <br /> 1.0 PROJECT DESCRIPTION <br /> The project consists of developing the site with an approximately 45,000 square-foot storage building, a <br /> stormwater detention vault, retaining wall, and associated paved access,parking, and utility improvements. Based <br /> on a preliminary grading, paving, and storm drainage plan prepared by Barghausen Consulting Engineers, dated <br /> June 23, 2015 the building will have a finish floor elevation of 554.0 feet. Grading to achieve the finish floor <br /> elevation and surrounding pavement elevations will involve cuts and fills from one to eight feet. The vertical <br /> grade transition on the west side of the site will be supported by a retaining wall. <br /> The plans indicate that stormwater runoff collected from the planned development area will be routed to a below- <br /> grade stormwater detention vault located in the southern portion of the site. The plan shows the stormwater vault <br /> is dimensioned at approximately 60 feet by 156 feet with the bottom of the vault at elevation 540.5. Excavation <br /> on the order of 9 to 19 feet will be required to reach the vault foundation elevation. <br /> We expect the structure will be constructed using perimeter precast concrete tilt-up wall panels with interior <br /> isolated columns spaced at 40-to 50-foot centers supporting a steel or wood truss roof system. Floor slabs will be <br /> =nstructed at grade. Structural loading is expected to be light to moderate, with isolated columns carrying loads <br /> =50 to 80 kips,and bearing walls carrying 4 to 8 kips per foot. <br /> The recommendations in the following sections of this report are based on our understanding of the preceding <br /> design features. We should review design drawings as they become available to verify that our recommendations <br /> have been properly interpreted and to supplement them, if required. <br /> 2.0 SCOPE OF WORK <br /> Our scope of work was completed in accordance with our authorized proposal, dated October 5, 2015. On <br /> October 13, 2015, we visited to the site to confirm the surface conditions are similar to when we first conducted <br /> our subsurface exploration. Based on our visual observations, the existing surface site conditions are similar to <br /> the conditions at the site when we conducted our subsurface exploration. Therefore, it is our opinion,that the soil <br /> conditions observed in 2007 are likely the same today. On August 21, 2007, we excavated 5 test pits to depths of <br /> 9 to 15 feet below existing surface grades. Using the information obtained from our subsurface exploration, we <br /> preformed analyses to develop geotechnical recommendations for project design and construction. Specifically, <br /> this report addresses the following: <br /> • Soil and groundwater conditions <br /> • Seismic considerations <br /> • Site preparation and grading <br /> • Excavation and shoring <br />