Laserfiche WebLink
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: <br /> Construction BMPs will be in place for risks of erosion. Primarily this will be in the <br /> form of silt fence or coir log in areas where new outfall pipes will be placed. <br /> 2. Air <br /> a. What types of emissions to the air would result from the proposal during construction, <br /> operation, and maintenance when the project is completed? If any, generally describe and <br /> give approximate quantities if known. Construction equipment exhaust, asphalt <br /> placement, and paint for parking area striping will be sources of emission during the <br /> project. Durning and after construction, the site will continue to operate as a bus yard <br /> and transit facility, with associated vehicle emissions. The finished project will not <br /> increase the amount of emissions from existing levels. <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, <br /> generally describe. There are no anticipated off-site sources of emissions that may <br /> affect the project. <br /> c. Proposed measures to reduce or control emissions or other impacts to air, if any: <br /> Construction vehicles and equipment will be turned off when not in use to the extent practical. <br /> Unncessary idling during construction will be minimized. Contractors will be encouraged to <br /> use Ultra-Low Sulfur Diesel fuel (ULSD). Water spray will be used to keep dust to a minimum as <br /> needed. <br /> 3. Water <br /> a. Surface Water: <br /> 1) Is there any surface water body on or in the immediate vicinity of the site (including <br /> year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe <br /> type and provide names. If appropriate, state what stream or river it flows into. Merrill <br /> Ring Creek borders the eastern property edge and is a seasonal stream at this <br /> segment and upstream. Year round flows initiate though spring and seep flows <br /> 4,000 ft. downstream at the Merrill Creek Parkway. <br /> 2)Will the project require any work over, in, or adjacent to (within 200 feet)the described <br /> waters? If yes, please describe and attach available plans. Yes. The work will be within <br /> the footprint of previous construction and location of existing outfalls. <br /> 3) Estimate the amount of fill and dredge material that would be placed in or removed <br /> from surface water or wetlands and indicate the area of the site that would be affected. <br /> Indicate the source of fill material. None <br /> 4)Will the proposal require surface water withdrawals or diversions? Give general <br /> description, purpose, and approximate quantities if known. No <br /> 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. <br /> Existing outfalls are within the 100-year floodplain of the engineered channel. <br /> 6) Does the proposal involve any discharges of waste materials to surface waters? If so, <br /> describe the type of waste and anticipated volume of discharge. No <br /> SEPA Environmental checklist(WAG 197-11-960) July 2016 Page 8 of 15 <br />