Laserfiche WebLink
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, <br /> bicycle or state transportation facilities, not including driveways? If so, generally describe <br /> (indicate whether public or private). None. <br /> e. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air <br /> transportation? If so, generally describe. No. <br /> f. How many vehicular trips per day would be generated by the completed project or proposal? <br /> If known, indicate when peak volumes would occur and what percentage of the volume would <br /> be trucks (such as commercial and nonpassenger vehicles). What data or transportation <br /> models were used to make these estimates?The operation and traffic volumes of the <br /> base will remain unchanged after the project. There will be no new trip capacity <br /> generated by the project. <br /> g. Will the proposal interfere with, affect or be affected by the movement of agricultural and <br /> forest products on roads or streets in the area? If so, generally describe. No. <br /> h. Proposed measures to reduce or control transportation impacts, if any: Alternate exit/entry <br /> routes and protocol to the facility during construction. Center turn lanes exist at all <br /> entry/exits to the project site and disruption to Hardeson Road traffic is not expected. <br /> 15. Public Services <br /> a. Would the project result in an increased need for public services (for example: fire protection, <br /> police protection, public transit, health care, schools, other)? If so, generally describe. No. <br /> b. Proposed measures to reduce or control direct impacts on public services, if any. Not <br /> Applicable <br /> 16. Utilities <br /> a. Utilities currently available at the site: electricity, natural gas,water, refuse service, <br /> telephone, sanitary sewer, internet, stormwater treatment. <br /> b. Describe the utilities that are proposed for the project, the utility providing the service, <br /> and the general construction activities on the site or in the immediate vicinity which might <br /> be needed. None <br /> C. Signature <br /> The above answers are true and complete to the best of my knowledge. I understand that the <br /> lead agency is relyin them to make its vision. <br /> Signature: OW • *41,1'h -44 <br /> Name of signee f'Jovunkers <br /> Position and Agency/Organization Director of Planning & Development, Community Transit <br /> Date Submitted: I 201B <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 age 15 of 15 <br />