|
— - • .f�es� g
<br /> •
<br /> � Rr2
<br /> . . . .
<br /> . .
<br /> • . . . • •
<br /> . .. •
<br /> . .
<br /> , .
<br /> . n. . . . ..
<br /> . .. ;I.,,,,R.Fn
<br /> , • . . , .. . • .
<br /> QUADRANT � "
<br /> . . . . • ..
<br /> . . .....
<br /> • • . ,.. •. .• •. .
<br /> COMMUNITY TRANSIT — HARDESON ROAD FACILITY LL}
<br /> .•,,,
<br /> 0
<br /> .. 2
<br /> 0
<br /> Z
<br /> %REfS:. •
<br /> — 2
<br /> 3
<br /> • x
<br /> x
<br /> DEVELOPER: ENGINEER: ARCHITECT:
<br /> THE QUADRANT CORPORATION • W&H PACIFIC • LANCE MUELLER AND ASSOCIATES MERRILL
<br /> QUADRANT PLAZA SUITE 500- 3025 112th AVENUE N.E. 130 LAKESIDE CRS
<br /> P.O. BOX 130 BELLEVUE WA 98009 P.O. BOX C-97304 SEATTLE WA 98122 PARKWAY
<br /> CONTACT: GEORGE SHERWIN, MICHAEL WARREN BELLEVUE, WA. 98009-9304 CONTACT: MICHAEL GALBRAITH, HAROLD CHRISTENSEN • a
<br /> (206) 646-8317 CONTACT: MICHAEL CROWSON, STEVEN PESCE (206) 325-2553
<br /> (206) 827-0220 N �,
<br /> a 3
<br /> z.
<br /> •
<br /> M //jg U
<br /> ri
<br /> ItPUGET re = Sti,t,y o
<br /> LI T OF DRAWI � G . MUKIETEO EVERETT J r iv J SOUND V
<br /> ^' •.,�*. PROJECT LL..M BOEING ? SITE CI
<br /> E
<br /> C1.0 COVER SHEET -..4.
<br /> PLANT
<br /> $ O
<br /> C1.1 T.E.S.C.P. PLAN ,� c O
<br /> 84th St.
<br /> C1.2 T.E.S.C.P. PLAN ///: r a �� 80th 2Q 14.J
<br /> SR526 p W
<br /> C2.1 STORM, GRADING AND PAVING PLAN a a
<br /> C2.2 STORM, GRADING AND PAVING PLAN o c) (,,r)C3.1 WATER PLAN _
<br /> C4.1 SANITARY SEWER PLAN
<br /> C5.1 DETAILS — SHEET 1 Qin
<br /> C5.2 DETAILS — SHEET 2 VICINITY MAP N QQ 0 R
<br /> C5.3 SECTIONS NTS s
<br /> C6.1 — C6.4 COMPOST STORM WATER FILTER O>- w n
<br /> Z V
<br /> O
<br /> O
<br /> GENERAL N *TES
<br /> VERTICAL DATUM
<br /> - THE BENCHMARK FOR THIS SURVEY IS THE TOP OF MONUMENT IN CASE
<br /> . - IN THE CENTERLINE OF HARDESON ROAD, APPROXIMATELY 350 FEET NORTHERLY -
<br /> 1. The following are the main Standards and Specifications currently utilized for design and construction FROM THE SOUTHEAST CORNER OF LOT 1,ELEVATION 533.02,BASED ON THE
<br /> . within the City of Everett listed in order of priority. - _ CITY OF EVERETT DATUM.
<br /> a. City of Everett Design and Construction Standards and Specifications. 'BASIS OF BEARING
<br /> BINDING SITE PLAN/RECORD OF SURVEY RECORDED IN VOLUME 33 OF BINDING
<br /> •
<br /> b. WSDOT/APWA Standard Specifications and Plans for Road and Bridge Construction as published jointly by the SITE PLANS/RECORDS OF SURVEYS AT PAGES 124 THROUGH 126 UNDER RECORDING
<br /> c Washington State Department of Transportation and the Washington State Chapter of the American Public Workers Association. NUMBER 9011055004, RECORDS OF SNOHOMISH COUNTY, WASHINGTON.
<br /> a. U.S. Department of Transportation Manual on Uniform Traffic Control Devices as amended and approved by _
<br /> Washington State Department of Transportation (MUTC0).
<br /> I d. Additionally, special requirements may be applied as required by miscellaneous agencies such as: State.Board of
<br /> Health, Department of Fisheries and Game, etc. 6
<br /> 2. Workperformed within the public right—of—way, whether byor for a private developer, byCit forces, byor a Citycontractor, INSTRUMENTATION FOR THIS SURVEY WAS A I SECOND TOTAL STATION. k
<br /> p pe y PROCEDURES USED IN THIS SURVEY WERE FIELD TRAVERSE,MEETING
<br /> k
<br /> shall be done to the satisfaction of the City Engineer and in accordance with approved plans and the Standards. Unless u+I:i
<br /> ppany proposed approvedp approvedby City 9. implemented. OR EXCEEDING STANDARDS SET BY WAC 332-130-090. K
<br /> otherwise approved, revision ro osed to plans must be the Engineer before being L.I
<br /> EASEMENTS BASED UPON THE TRIAD ASSOCIATES ALTA/ASCM LAND TITLE SURVEY r`i cc
<br /> It is the responsibility of the developer, contractor or their agents to notify the City in advance of the commencement of any ENTITLED MERRILL CREEK CENTRE,JOB NUMBER 95-225,SHEETS I AND 2,
<br /> authorized work and to hove all work inspected as construction progresses. Advance conference and/or field review shall be SURVEYOR'S CERTIFICATE DATED SEPT 16, 1995.
<br /> required before the start of any work on significant projects.
<br /> 3. The developer and contractor shall schedule and control his work so as to prevent all hazards to public safety, health and
<br /> THE INFORMATION DEPICTED ON THIS MAP REPRESENTS THE RESULT OFA -10:::67)
<br /> w _
<br /> welfare. - SURVEY MADE ON SEPTEMBER 28&29, 1995 AND CAN ONLY BE CONSIDERED ___-..?°"4_._ a `
<br /> AS INDICATING THE CONDITIONS AT THAT TIME. ' '!1¢p
<br /> Upon completion of construction, the"original" approved plan shall be"as-built by the developer's or contractors engineer � `•+ "_ +
<br /> s and submitted to the Public Works Department for permanent records. The submission of'As-Bunts" (mylars) shall be THIS SURVEY MEASURES SURFACE EVIDENCE ONLY,UNDERGROUND UTILITIES SHOWN =___ "k e
<br /> ar.
<br /> considered port of the performance required to complete a project. The Certificate of Occupancy and the Performance SHOULD BE VERIFIED THROUGH LOCATION SERVICES ',ivr,. �-
<br /> Guarantee as noted in Section 1.7 will be retained by the City until this requirement is met. As-builts for active water main !v-- -
<br /> extensions are required within 14 days of completion.
<br /> , 4. Arrange for and attend pre-construction meeting with owner and City.
<br /> ro
<br /> 5. Existing utility locations as shown on the plans have been obtained from available records and are shown for convenience.
<br /> The Contractor shall be responsible for verification of locations shown and discovery of possible additional utilities not shown, - LEGAL DFSCRIPIION. I '•I n
<br /> so as to avoid damage or disturbance. The Contractor shall call the Underground Utility Locating Service (1-800-424-5555) THE LAND REFERRED TO HEREIN AS SITUATED IN THE STATE OF WASHINGTON, COUNTY OF SNOHOMISH I 'L\
<br /> 24 hours prior to beginning any excavation, no excavations shall be made until existing utilities are clearly marked in the field. AND IS DESCRIBED AS FOLLOWS: "a '
<br /> 6. An approved copy of these plans must be on the job site whenever construction is in progress. Lot 1 &2, of Binding Site Plan/record of Survey recorded under Auditor's File No. 9011055004, being ,(x
<br /> subject streets shall be kept clean of dirt and debris. • a portion of the Southeast quarter of Section 2, and the Northeast quarter of Section 11,all in = z c n m
<br /> 7. All sub
<br /> 1 P Township 28 North, Range 4 Eost, W.M. „o m, 5
<br /> E. Designs hove been developed based on a site survey by a licensed surveyor. - Situate in the County of Snohomish, State of Woshignton. f
<br /> i Wa2 5 a
<br /> 0. Material submittals must be approved by the owner's representative prior to construction. N1 1
<br /> `.'. 1D. Construction shall comply with the recommendation of the geotechnical report titled Subsurface Exploration and Geotechnical i i c ! I
<br /> Engineering Report"-, Dated April 1996 and prepared by AGRA Earth and Environmental, Inc. - i i z m Im I I
<br /> L 3 , 4 5 0 I 9 .. _.. ....
<br />
|