My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7000 HARDESON RD Geotech Report 2022-10-25
>
Address Records
>
HARDESON RD
>
7000
>
Geotech Report
>
7000 HARDESON RD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:31:51 PM
Creation date
6/5/2020 2:03:52 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7000
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report <br /> Community Transit Merrill Creek Operating Base <br /> 7100 Hardeson Road <br /> Everett, Washington <br /> February 28, 2018 <br /> RN File No. 3224-002A <br /> Page 11 <br /> a "Where there is a lack of usable space for rain garden/bioretention facilities at re- <br /> development sites, or where there is insufficient space within the existing public right- <br /> of-way on public road projects." <br /> o In our opinion, there is a lack of usable space in the narrow, landscaped islands <br /> at this re-development site. <br /> Sheet Flow Dispersion BMP T5.12: This BMP is discussed on page 5-6 of DOE Volume V. <br /> "This BMP can be used in any situation where concentrated flow can be avoided. The design <br /> guidelines state "Because flows are already dispersed as they leave the surface, they need <br /> only traverse a narrow band of adjacent vegetation for effective attenuation and treatment." <br /> Although concentrated flows are avoided because the parking and drive aisles have relatively <br /> flat slopes, the surface flow goes directly into a trench drain at the eastern edge of the paved <br /> area. Design guidelines call for a 2-foot wide transition zone and a 10-foot wide vegetated <br /> buffer for every 20-foot width of impervious surface. In our opinion, this BMP is not feasible <br /> because the edge of the asphalt abuts the trench drain leaving no room for a transitions zone or <br /> its associated buffer. <br /> Concentrated Flow Dispersion BMP T5.11: DOE page 5-3 of Volume V states that this BMP <br /> can be used "in any situation where concentrated flow can be dispersed through vegetation." <br /> The vegetation on the site is limited to the landscaped islands. The design guidelines discuss a <br /> vegetated flowpath of at least 50 feet. In our'opinion, based on the lack of a vegetated flowpath <br /> this BMP is infeasible. <br /> Utilities <br /> Our explorations indicate that deep dewatering will not be needed to install standard depth <br /> utilities. Anticipated groundwater is expected to be handled with pumps in the trenches. We <br /> also expect that some groundwater seepage may develop during and following the wetter <br /> times of the year. We expect this seepage to mostly occur in pockets. We do not expect <br /> significant volumes of water in these excavations. <br /> The soils likely to be exposed in utility trenches after site stripping are considered moisture <br /> sensitive. We recommend that they be considered for trench backfill during the drier portions <br /> of the year. Provided these soils are within 2 percent of their optimum moisture content, they <br /> should be suitable to meet compaction specifications. During the wet season, it may be difficult <br /> to achieve compaction specifications; therefore, soil amendment with kiln dust or cement may <br /> be needed to achieve proper compaction with the on-site materials. <br /> Pavement Subgrade <br /> The performance of roadway pavement is critically related to the conditions of the underlying <br /> subgrade. We recommend that the subgrade soils within the roadways be prepared as <br /> described in the Site Preparation and Grading subsection of this report. Prior to placing base <br /> material, the subgrade soils should be compacted to a non-yielding state with a vibratory roller <br /> compactor and then proof-rolled with a piece of heavy construction equipment, such as a fully- <br /> Robinson Noble, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.