Laserfiche WebLink
FEES BEFORE ISSUING PERMITS <br /> EXTRA PLAN CHECK FEE OR CREDIT <br /> BUILDING PERMIT FEE ✓/ <br /> CHECK ALL SURCHARGES (SFR/COMM) <br /> PLUMBING FEE <br /> MECHANICAL FEE <br /> V1/7 <br /> PLAN BLDG REV FEE <br /> WATER/SEWER SYSTEM DEV FEE'S ON "U" PERMIT kqC, <br /> STORM WATER SYSTEM DEV FEE ON "B" PERMIT <br /> TRAFFIC MITIGATION FEE NPS <br /> SCHOOL IMPACT FEE ��QJ <br /> FIRE REVIEW FEE (2019 ONLY) <br /> WATER FEE hf� <br /> SEWER FEE <br /> EXTRA PLUMBING PERMIT DCDA/ RPVA/WATER LINE SPC <br /> FINAL PLANNING NOTE/ADD INSPECTION NIA <br /> SPRINKLERS REQUIRED NOTE P�- <br /> FIRE ALARMS REQUIRED NOTE 0)j <br /> APPROVE PUBLIC WKS PERMIT AND WORKSHEET <br /> PARK FEE <br /> RCW BUILDING ENVELOPE N`� <br /> &X56 <br />