Laserfiche WebLink
1/3/2020 City of Everett Page <br /> 12:34:29PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1908-050 Site Address 310 OLYMPIC BLVD <br /> Applied 8/7/2019 Applicant VALDIVIA MARYSOL Lot <br /> Approved 8/7/2019 Owner STUMPF MARK A&ELIZABETH M TRUST Block <br /> Issued 8/8/2019 Contractor MARVAL ELECTRIC LLC Tract <br /> Parent Permit No. C1901-018 Description .COMPLETE REWIRE <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 8/22/2019 8/22/2019 ELEC 06-ROUGH SKB APPROVAL as noted 8/21/2019 8:59 PM <br /> IN Owner Mark Stumpf <br /> 425 319 8217 <br /> Contact Name:Eziquiel Ramierez <br /> Site Address:310 Olympic blvd Everett wa <br /> 98203 <br /> Phone:4253301498 <br /> e-Mail:Marvalelectric@gmail.com <br /> (8/22/2019 1:32 PM SKB) <br /> Only one flex down for floor heat check at <br /> final check OCD,AFCI and GFCI at final <br /> not installed yet.Kitchen appears to be <br /> built-ins check spacing it final. <br /> S/22/2019 8/22/2019 ELEC 05-SERVICE SKB APPROVAL as noted (8/22/2019 1:32 PM SKB) <br /> Bond metal waste system. <br /> 12/13/2019 12/13/2019 ELEC 09-FINAL SKB CORRECTION (12/13/2019 11:30 AM SKB) <br /> Heat pump states 32.5 amp minimum. <br /> disconnect is rated for only 30 amps.It <br /> needs to be replaced with a 60 amp rated <br /> disconnect with 35 amp fuses. <br /> 12/16/2019 12/16/2019 ELEC 09-FINAL SKB NOT READY (12/16/2019 1:15 PM SKB) <br /> Corrections not completed. <br /> 1/2/2020 1/2/2020 ELEC 09-FINAL SKB APPRVD-PERN Mark:425-319-8217 <br /> 1/2/2020 1/2/2020 ADMIN USE HPC APPROVAL <br /> ONLY** <br /> INSP12 CRWsYSTEMS <br />