My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 SEAWAY BLVD 2020-06-05
>
Address Records
>
SEAWAY BLVD
>
3315
>
3315 SEAWAY BLVD 2020-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 3:23:08 PM
Creation date
6/5/2020 3:18:13 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3315
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CELEBRATING Drew Martin, P.E.,S.E. <br /> grr 125 <br /> Associate Engineer—Commercial Plans Examiner 1 Permit Services <br /> YEARS 425.257.8813 1 3200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> A story worth telling everettwa.gov/permits 1 Facebook 1 Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> From:Chris Lermusik<clermusik@umci.com> <br /> Sent:Wednesday, December 26, 2018 11:59 AM <br /> To: Drew Martin<dmartin@everettwa.gov> <br /> Cc: 'Nadia Azarova'<nadia@craftarchitects.com>; Craig Stainer<cstainer@dci-engineers.com>; Randy Koetje <br /> <rkoetje@umci.com> <br /> Subject: RE: City of Everett Permit Services:Terra Power Mechanical Permit(M1812-032) <br /> Thanks Drew. I'll speak with Craig and Nadia and get a response for you. <br /> Chris <br /> From: Drew Martin<dmartin@everettwa.gov> <br /> Sent:Wednesday, December 26, 2018 11:56 AM <br /> To:Chris Lermusik<clermusik@umci.com> <br /> Cc: 'Nadia Azarova'<nadia@craftarchitects.com>; Craig Stainer<cstainer@dci-engineers.com> <br /> Subject: City of Everett Permit Services:Terra Power Mechanical Permit(M1812-032) <br /> Chris, <br /> I'm reviewing the mechanical permit submittal for ductwork into Electrical Rooms 101 and 102, and Restrooms 104 and <br /> 105. Please address the following questions: <br /> 1. The duct from the restrooms per Sheet M6.01 penetrates the exterior structural concrete wall panel. Verify <br /> with the structural engineer that the location of the penetration does not impact the structural performance of <br /> the wall panel. The elevation of the penetration relative to the finished floor,or another reference elevation, <br /> should be specified in the drawings. <br /> 2. The ducts for the restrooms are penetrating the ceiling and the exterior walls. Radiation dampers(ceiling)and a <br /> fire damper(exterior wall)do not appear to be required. The architect should confirm. <br /> 3. The ducts for the electrical rooms are penetrating the walls. The walls do not appear to fire-rated construction, <br /> and therefore do not require dampers. The architect should confirm. <br /> CELEBRATING 125 <br /> 1Drew Martin, P.E.,S.E. <br /> grr Associate Engineer—Commercial Plans Examiner 1 Permit Services <br /> YEARS 425.257.8813 1 3200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> A story worth telling everettwa.gov/permits 1 Facebook 1 Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br />
The URL can be used to link to this page
Your browser does not support the video tag.