My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 SEAWAY BLVD 2020-06-05
>
Address Records
>
SEAWAY BLVD
>
3315
>
3315 SEAWAY BLVD 2020-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 3:23:08 PM
Creation date
6/5/2020 3:18:13 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3315
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REG 07-20-2018(FRI) 13:05 <br /> T.L . REG-1 019405 <br /> 1,T 1 <br /> PERMIT M0.1807033 <br /> A/411 <br /> a FIS <br /> $1,191.94 <br /> ETT• T1_ $1.9.191.94 <br /> (425)257-8810 CHECK $1,191.94 <br /> Plan Check No.: B1807-033 <br /> Application Date: 7/20/2018 <br /> Tenant: TERRAPOWER <br /> Owner: SEAWAY WEST LLC <br /> Job Address: 3315 SEAWAY BLVD BLDG A <br /> Proposed Use: COMMERCIAL <br /> Description of Work: TI-ADD TOILET ROOMS/INSULATE <br /> ENTIRE BUILDING <br /> Plan Check Fee Paid: $1191.94 <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application,it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing.If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> 11)e<- <br /> 07 (2.0I i8 <br /> Signature Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.