Laserfiche WebLink
111.111111111 <br /> MEM EMI <br /> submittal section.This section has also been updated to include requirements for the <br /> elevator shop drawing submittal. <br /> 10. Section 2/A5.6 shows an elevator hoist beam. The beam is not located at the roof level and <br /> appears to require support from the mezzanine structure framing. The structural plans do not <br /> appear to include either the beam or framing to support it and should be revised. Framing <br /> connections are required to provide a minimum positive connection capacity per ASCE 7-10 <br /> Section 1.4.4. Calculations substantiating the framing and connections should be submitted for <br /> review. See IBC Sections 1603.1 and 1604.1. <br /> DCI Response: Calculations for an elevator hoist beam and rail supports have been performed, see <br /> updated calculations sheets 0-41 thru 0-43. Loading used was based on loads received from an <br /> elevator manufacturer for a similar elevator. These loads have been added to the plans on sheets <br /> S2.0 and S2.1. A plan note has been added to both sheets that alert the contractor to the elevator <br /> support process. <br /> Sincerely, <br /> DCI Engineers <br /> 07?-4( Ak-5k4 <br /> Craig A. Stainer, P.E., S.E. <br /> Associate <br />