Laserfiche WebLink
z i <br /> 1111111111011111 <br /> filters that weigh about 1,600 pounds each. Distributing that loads as a percentage of the 125 PSF <br /> loading is actually only about 1%of the 125 PSF.So the current design is conservative for the <br /> intended loading. <br /> d. Continuing with the previous comment,the design loads on Sheet 51.0 shall clearly <br /> distinguish the design loads for storage and permanent equipment. <br /> DCI Response:There is currently no intent for the ceiling of the TAT space to be used for storage. <br /> Sheet S2.1 shows the(3)three intended HEPA filter units on the TAT ceiling pan. <br /> e. The tributary wall mass to the structural lid only include the longitudinal walls. The <br /> mass should be increased to include the transverse walls. Note that a weight <br /> estimate of wall Types 2 and 12 per Sheet A8 appears to exceed 10 psf. Architect to <br /> verify that Wall Type 12 should include GWB on both sides similar to other wall <br /> types. <br /> DCI Response:The total dead load assigned to the ceiling of the TAT space as seismic mass is 23 <br /> PSF.The dead load of the ceiling is calculated as 13.4 PSF.This leaves 9.6 PSF to allow for the <br /> tributary mass of the walls below.This more than adequate for the walls that exist below the TAT <br /> ceiling.Also,it is our understanding that wall type 12 has drywall on one side and plywood on the <br /> other side.Even if drywall were to be added over the sheathing the weight of the wall would be <br /> 9.9 PSF.The weight summary of the wall is 2.8 PSF for 2x10 studs @ 16"o.c.,2.8 PSF for each layer <br /> of 5/8 GWB and 1.5 PSF for'A"sheathing.See calculations sheet S-1. <br /> f. It is not clear if the 125 psf load represents both permanent equipment and storage <br /> loads. Where either load is not equally distributed across the structural lid,the <br /> weights shall be effectively loaded to the wall lines support the associated lateral <br /> seismic load. Non-uniformly distributed loads shall not be uniformly distributed to <br /> all wall lines. <br /> DCI Response:The ceiling of the TAT space will only have 3 HEPA filters.The contact load to the <br /> ceiling framing is about 31 PSF which is much less than the 125 PSF design load.The lateral system <br /> has been overdesigned using 25%of 125 PSF as the seismic mass attributed to the mechanical <br /> equipment. <br /> g. The limited wall length on Grid 4.4 is only 7 feet long,not 9'-10" per page T-6. <br /> DCI Response:The shear walls on grid 4.4 have been redesigned using the updated wall lengths. <br /> Which are now 7'-0", 19'-10"and 23'-3".See supplementary calculations sheets S-2 thru S-4. <br /> h. Page T-6 includes a 4'tributary roof width resisting overturning for the walls on <br /> Grids 4.4 and 3. Based on the joist spacing of 16" per Sheet 52.1,the tributary width <br /> is only 8". The resisting weight shall be reduced. <br /> DCI Response:A 4'tributary floor or ceiling width when framing is parallel to the shear wall has <br /> been used to calculate the associated dead load effective in resisting shear wall uplift.This 4' <br />