My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 SEAWAY BLVD 2020-06-05
>
Address Records
>
SEAWAY BLVD
>
3315
>
3315 SEAWAY BLVD 2020-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 3:23:08 PM
Creation date
6/5/2020 3:18:13 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3315
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ,. <br /> The sheet A2.7 should have been included with the hardcopy submittal,as I wrote the transmittal based on the actual <br /> drawings I had. My apologies, if this have been omitted. Sheet A2.7 is a reflected ceiling plan: room 133 has no ceiling, <br /> as the previous drawings were indicating plywood ceiling there.—Please find it attached with this email. Sheet A2.4 <br /> shows elimination of the non-structural partition between room 205&206 in the southeast corner of the 2nd floor <br /> office: IT/AV room 205 has been deleted and storage room 206 received that space. Please find sheets A2.4&A2.7 <br /> attached. <br /> 2. The TAT does not appear to have a lid to provide shielding above. Please comment on why this is not provided. <br /> TerraPower requested no ceiling in that room. I cannot comment on their technology. <br /> 3. The structural calculation narrative indicates changes to the wall on Grid 4.4. Please comment on the changes, <br /> and verify that the architectural and structural drawings have been coordinated. <br /> Structural and architectural drawings are coordinated. Change along the TAT space wall designated as 4.4 on structural <br /> calculations consists of a revised location for door#130B that have been moved 1'6" south. <br /> 4. The containment room includes a lead door. Please provide information on this door, including the weight and <br /> embedments required for the door tracks. <br /> Please find attached cut sheet for the lead lined door. <br /> 5. Detail 12/S4.1 specifies the railing construction. This detail does not appear to be referenced on the <br /> plans. Clarify how the extent of the railing is specified. <br /> The structural detail and railing extent is referenced on sheet A2.3, key note 12 & 16. <br /> 6. The only structural sheets affected by the changes appear to be S2.0,S2.1,and S4.1. Please confirm.— <br /> Confirmed. <br /> Pending responses, I may be able to complete the review of this project. Please contact me if you have questions. <br /> gn. CELEBRATING Drew Martin, P.E.,S.E. <br /> 1 25 Associate Engineer—Commercial Plans Examiner I Permit Services <br /> YEARS 425.257.8813 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> A story worth telling everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> (31) <br />
The URL can be used to link to this page
Your browser does not support the video tag.