Laserfiche WebLink
INSPECTION REPORT <br /> Date / /'Permit: /3/Yee- �`2" <br /> ,, • <br /> , „ <br /> �. Contractor: <br /> 7a175--(ii <br /> AP, Owner: <br /> I . <br /> to Addr-- �� 1_ _/? L/ AP , .0`I1-A <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> El Groundwork noting ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑GasPipeFinal ❑HWT Final <br /> OTHER OR CONSULTATION:2e ''50/' GG <br /> ! Q_1-7_ <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> fo o.77 040(6 -.' '-- <br /> N 4 Tc..-"7 i, 001;61- .1 W SP cT-o.v 19 <br /> RSZI <br /> Inspector: r Date: /7-go $/ <br /> EIR(10/06) DATABAR,INC. <br />