Laserfiche WebLink
4 <br /> SCOPE OF WORK (continued) <br /> Task 4 30% Design <br /> Assumptions: The following assumptions apply to this task: <br /> • An additional plan with profile sheet will be needed to account for the expanded project <br /> limits. <br /> • Utilities that could be impacted by lowering the storm drain will be relocated separately from <br /> this project. The utilities will be shown on the plans as currently reflected in the base map <br /> but noted as having been relocated. <br /> Task 5 90% Design <br /> Assumptions: The following assumptions apply to this task: <br /> • An additional plan with profile sheet will be needed to account for the expanded project <br /> limits. <br /> Task 6 Final Bid Documents <br /> Assumptions: The following assumptions apply to this task: <br /> • An additional plan with profile sheet will be needed to account for the expanded project <br /> limits. <br /> • <br /> • <br /> City of Everett 556-1844-007(01/09) <br /> Evergreen Way Water Quality Retrofit 6 August 2014 <br /> Scope Amendment 1 <br /> 121 <br />