My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/12/24 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/12/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 10:53:54 AM
Creation date
6/10/2020 10:49:03 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/24/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET: <br /> PROJECT TITLE: <br /> Final Acceptance & Briefing COUNCIL BILL# <br /> Certification of Completion Proposed Action Originating Department Public Works <br /> with Razz Construction for the Consent Contact Person Tom Fuchs ' <br /> Horizon Elementary School Action Phone Number 425-257-8931 <br /> Walk Route Safety Project First Reading FOR AGENDA OF 12/24/2014 <br /> Second Reading <br /> Third Reading <br /> Public Hearing Initialed by: <br /> Budget Advisory Department Head <br /> CAA C' <br /> Council President 1 <br /> Location Preceding Action Attachments Department(s)Approval <br /> List of Streets 3/12/2013 Bid Final Contract Voucher Certification, Public Works <br /> Attached 4/3/2013 Award Certificate of Completion, Final <br /> COs#1-3 Estimate <br /> Amount Budgeted $539,342.48 Work Order#PW 3404 <br /> Expenditure Required $532,586.55 <br /> Budget Remaining $6,755.93 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> • This project involved construction of overhead signs,radar speed warning system,directional boring, conduit <br /> installation, ADA ramps, and other school zone safety improvements. <br /> The general contractor,Razz Construction, completed the Horizon Elementary School Walk Route Safety <br /> Project in accordance with the plans and specifications and to the satisfaction of the Public Works <br /> Department. <br /> Original Contract Amount: $453,635.00 <br /> Change Orders 1-3: $85,707.48 Various issues that arrived during construction. <br /> WA State Sales Tax: $0.00 <br /> Total Contract Amount: $539,342.48 <br /> • The contract total paid to date: . $536,741.89 <br /> • The amount of retainage withheld: $4,155.34 (Contract exceeded retainage bond provided) <br /> • Washington State Sales tax paid $0.00 <br /> $532,586.55 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Accept the Horizon Elementary School Walk Route Safety Project as complete and authorize the Mayor to <br /> sign the Certificate of Completion with Razz Construction. <br /> 61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.