My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1816 WETMORE AVE 2020-06-15
>
Address Records
>
WETMORE AVE
>
1816
>
1816 WETMORE AVE 2020-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 7:46:44 AM
Creation date
6/15/2020 7:45:41 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
1816
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC=mORKS PERMIT =ate Applied: 10/15/2018 <br /> City of Everett Permit Services Public Works Permit#: PW1810-038 <br /> 40,1161,-41 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: C1808-004 <br /> Everett,WA 98201 Planning Reference It: <br /> '411 ..2 <br /> (425)257-8810 Public Works Fee: $65.00 <br /> 12 MAR LU <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> RETTENMIER CORY RETTENMIER CORY <br /> 1816 WETMORE AVE 1816 WETMORE AVE <br /> EVERETT, WA, 98201-2242 EVERETT, WA, 98201-2242 <br /> PHONE: PHONE: <br /> TAX PARCEL ID#: 00438036802500 SITE ADDRESS: 1816 WETMORE AVE <br /> DESCRIPTION: SFR ADDITION, BATHROOM AND BEDROOMS <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 10/15/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation and to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requested. See the <br /> attached handout for phone number and online instructions to Request an Inspection. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or <br /> easements and the improvements located therein. <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Call the inspection line to <br /> request a Final for this permit when all items have been completed. <br /> Public Works Permit Fee Breakdown: g3Qt <br /> �J <br /> Misc. Minor Permits (Drainage Work) $25.00 <br /> PW Plan Review $20.00 MAR 1 2 2019 <br /> PW Site Inspection $20.00 <br /> CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Evere • •-- -. and all claims for damages,costs, <br /> 7---40". <br /> expenses,or causes of actio that may . ' e because of installation and <br /> /D�/ 20!$ maintenance of the imp t or other fight of way use hereto applied <br /> pproved for C• struction (Public Works) atU a for and furthe -. ees to r: ove same .on notice from the Cityand to <br /> replace •..is pro.-'-• d. aged th- -.y. <br /> FINAL INSPECTION Date -.011L <br /> Approved as Constructed (PW Inspector) Signature of Apf D,,te <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFT•• IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.