My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9010 4TH AVE W 2020-06-15
>
Address Records
>
4TH AVE W
>
9010
>
9010 4TH AVE W 2020-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 8:45:36 AM
Creation date
6/15/2020 8:44:58 AM
Metadata
Fields
Template:
Address Document
Street Name
4TH AVE W
Street Number
9010
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/20/2019 Page <br /> City of Everett <br /> 8:19:14AM <br /> INSPECTION ACTIVITY REPORT <br /> 4 <br /> Permit No. C1812-009 Site Address 9010 4TH AVE W <br /> Applied 12/19/2018 Applicant HAACK BROTHERS INC Lot <br /> Approved 3/29/2019 Owner HAACK BROTHERS INC Block <br /> Issued 3/29/2019 Contractor HAACK BROTHERS INCORPORATED Tract <br /> Parent Permit No. PW1903-019 Description NEW SFR <br /> Notes (3/8/2019 1:50 PM TRN) <br /> PERMIT CONDITIONS: 1.Downspouts shall discharge to splash blocks.2.Erosion control measures <br /> shall be installed.3.No dirt,etc.to be tracked onto roadway. <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 4/4/2019 4/4/2019 BLDG 04-UFER KMK APPROVAL <br /> GROUND <br /> 4/4/2019 4/4/2019 BLDG KMK APPROVAL AM inspection requested <br /> 02-FOOTING/SETB <br /> 4/8/2019 4/8/2019 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 5/3/2019 5/3/2019 BLDG KMK APPROVAL 425-290-2429 <br /> 05-UNDERFLOOR <br /> 5/21/2019 5/21/2019 BLDG KMK APPROVAL <br /> 07-EXTERIOR <br /> 6/26/2019 6/26/2019 BLDG KMK APPROVAL eTRAKiT Inspection 6/25/2019 1:53 PM HAACK BROTHERS <br /> 08-FRAMING Request INCORPORATED <br /> Contact Name:HAACK BROTHERS <br /> INCORPORATED <br /> Site Address:9010 4TH AVE W <br /> Phone:4253977360 <br /> e-Mail:JOEL@HAACKBOTHERS.COM <br /> (6/26/2019 3:26 PM KMK) <br /> As noted:verify change in truss design at <br /> missing drag strut. <br /> 6/26/2019 6/26/2019 PLUMB DXW APPROVAL eTRAKiT Inspection 6/25/2019 1:53 PM HAACK BROTHERS <br /> 03-ROUGH IN Request INCORPORATED <br /> Contact Name:HAACK BROTHERS <br /> INCORPORATED <br /> Site Address:9010 4TH AVE W <br /> Phone:4253977360 <br /> e-Mail:JOEL@HAACKBOTHERS.COM <br /> 6/26/2019 6/26/2019 GAS 01-ROUGH IN DXW APPROVAL eTRAKiT Inspection 6/25/2019 1:53 PM HAACK BROTHERS <br /> Request INCORPORATED <br /> Contact Name:HAACK BROTHERS <br /> INCORPORATED <br /> Site Address:9010 4TH AVE W <br /> Phone:4253977360 <br /> e-Mail:JOEL@HAACKBOTHERS.COM <br /> (6/26/2019 12:36 PM DXW) <br /> as noted complete g/p through side off/p <br /> 6/26/2019 6/26/2019 MECH 04-ROUGH DXW APPROVAL eTRAKiT Inspection 6/25/2019 1:53 PM HAACK BROTHERS <br /> IN Request INCORPORATED <br /> Contact Name:HAACK BROTHERS <br /> INCORPORATED <br /> Site Address:9010 4TH AVE W <br /> Phone:4253977360 <br /> e-Mail:JOEL@HAACKBOTHERS.COM <br /> • <br /> (6/26/2019 12:32 PM DXW) <br /> as noted complete framing for F/P exh. <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.