Laserfiche WebLink
4, PROJECT RJNG FROM DEVELOPMENCHNICIAN <br /> (Public Works / Permit Services) <br /> Routed Date: 5/29/2018 <br /> Permit#: PW1804-043 <br /> PROJECT ADDRESS: 10200 19TH AVE SE Due: Approx: 6/14/2018 (Thurs) <br /> DESCRIPTION OF WORK: SITE WORK FOR EXPANSION OF COSTCO FUELING FACILITY (1St Review) <br /> PLANNING REFERENCE#'s(if applicable): <br /> PRE-APP MEETING #:_ PreAppl8-005 <br /> LAND USE PROJECT#: <br /> PUBLIC WORKS REVIEWER: Sabrina Fandler <br /> REQUEST: Please review the attached material for your area of concern and return any comments <br /> and/or redlines to the Public Works Reviewer listed above. <br /> ROUTED TO: <br /> ❑ Stormwater/Drainage: Jane Zimmerman/Arnie Roshak/Erik Emerson <br /> ❑ Traffic: Michael Brick/John Wisdom/ Corey Hert/Steve Sawyer/Tim Miller <br /> R Water Jim Spooner Tim Markham/Rich Hefti/Shane Cavanah <br /> Sewe Brian DoolajDave Voigt/Arnie Roshak/Mark Sadler <br /> ❑ Planning: Teresa Weldon/Grace Pollard/ Kelsey Heyd/Kembra Landry/Dave Tyler/John Jimerson/Steve Ingalsbe <br /> ❑ Building: Drew Martin/James Bronder/Jeff Heilman/Tony Lee <br /> ❑ Fire: Jim Venturo/Bill Armstrong/Chad Harris/Other <br /> R9UTED MATERIALS: <br /> Plans 0 Original City Comment Letter <br /> ❑ Traffic Control Plan 0 Original City Plan Markups <br /> ❑ Drainage Report 0 Original City Drainage Report Markups <br /> ❑ Geotechnical Report 0 SEPA Determination (for reference) <br /> ❑ Wetland Report 0 Preliminary Short Plat Approval (for reference) <br /> ❑ Arborist Report 0 Other: <br /> COMMENTS FROM REVIEWER: (Please make comments below and/or redlines on plans) <br /> STATUS: <br /> ❑ Approved <br /> ❑ Approved as Noted/Modified <br /> ❑ Revisions Required, See Comments <br /> ❑ Review Not RequiredG <br /> COMMENTS: Jlh7 /44.44 (/lYI(a <br /> a- Al DrQ-- I (,aal re, C 11 - 4 s�, <br /> d fha-- /Ar D. / // <br /> REVISED 12/07/2016 <br />