Laserfiche WebLink
• When you remove materials from the self-installed concrete washout, build a new <br /> structure; or, if the previous structure is still intact, inspect for signs of weakening <br /> or damage, and make any necessary repairs. Re-line the structure with new <br /> plastic after each cleaning. <br /> Removal of Temporary Concrete Washout Facilities <br /> • When temporary concrete washout facilities are no longer required for the work, <br /> the hardened concrete, slurries and liquids shall be removed and properly <br /> disposed of. <br /> • Materials used to construct temporary concrete washout facilities shall be <br /> removed from the site of the work and disposed of or recycled. <br /> • Holes, depressions or other ground disturbance caused by the removal of the <br /> temporary concrete washout facilities shall be backfilled, repaired, and stabilized <br /> to prevent erosion. <br /> Page 147 <br />