Laserfiche WebLink
TABLE OF CONTENTS <br /> 1.0 PROJECT OVERVIEW <br /> Figure 1 -Vicinity Map <br /> Figure 2-Assessor Map <br /> Figure 3- FEMA Map <br /> Figure 4-Soil Survey Map <br /> Figure 5-Sensitive Areas Map <br /> 2.0 ANALYSIS OF THE MINIMUM REQUIREMENTS <br /> Figure 6- Flow Chart for Determining Requirements for Redevelopment <br /> Figure 7-Snohomish County Property Account Summary <br /> 3.0 EXISTING CONDITIONS SUMMARY <br /> Figure 8- Existing Conditions Map <br /> 4.0 OFF-SITE ANALYSIS REPORT <br /> 5.0 PERMANENT STORMWATER CONTROL PLAN <br /> A. EXISTING SITE HYDROLOGY <br /> B. DEVELOPED SITE HYDROLOGY <br /> Figure 9- Developed Conditions Map <br /> C. PERFORMANCE STANDARDS AND GOALS <br /> D. LOW IMPACT DEVELOPMENT FEATURES <br /> E. FLOW CONTROL SYSTEM <br /> F. WATER QUALITY SYSTEM <br /> G. CONVEYANCE SYSTEM ANALYSIS AND DESIGN <br /> Figure 10- Basin Map <br /> 6.0 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN <br /> 7.0 SPECIAL REPORTS AND STUDIES <br /> Figure 11 - Storm Drainage Report prepared by Barghausen Consulting Engineers, Inc. dated <br /> November 15, 2005 <br /> Figure 12-Geotechnical Recommendations prepared by Kleinfelder dated July 31, 2015 <br /> 8.0 OTHER PERMITS <br /> 6226.038-SSP.doc <br />