Laserfiche WebLink
1.0. PROJECT OVERVIEW <br /> The proposed fuel facility expansion project is located within the south half of the northeast <br /> quarter of the northeast quarter of Section 19, Township 28 North, Range 5 East, lying between <br /> Interstate 5 to the west, 19th Avenue S.E. to the east and south of 102nd Street S.E., Parcel No. <br /> 28051900101000. See Figures 1 and 2 for the Vicinity Map and Assessor's Map respectively. <br /> The site is in Flood Zone X, in an area determined to be outside the 500-year floodplain. See <br /> Figure 3 for the FEMA Map. <br /> The project includes a 3,360-square-foot expansion of the existing fuel canopy(7,115 square feet <br /> total) into the vehicle queuing area, with the addition of four (4) new fuel dispensers. Additional <br /> improvements include associated grading within the fuel queuing area and a modification to the <br /> channelization island at the driveway along 19th Avenue S.E. to accommodate the larger turning <br /> radius of vehicles currently using this driveway. <br /> The project proposes to maintain the existing flow control and water quality treatment established <br /> in 2006 with the on-site parking lot improvements. In the existing condition, site drainage flows to <br /> the existing detention pond and stormfilter system per the treatment criteria of the 2012 <br /> Stormwater Management Manual for Western Washington (SWMMWW), as Amended in <br /> December 2014 (The 2014 SWMMWW). <br /> 6226.038-SSP.doc <br />