Laserfiche WebLink
Does the project discharge to Flow Control Exempt Waters(per Minimum Requirement(MR)#7)? <br /> Eyes _ <br /> REQUIRED: Implement the following BMPs NO <br /> where feasible: <br /> • BMP T5.13: Post-Construction Soil Quality ♦ No(the <br /> and Depth Does the project project <br /> • BMP T5.10A, B, or C: Downspout Full trigger only MRs#1 - triggered <br /> Infiltration, Downspout Dispersion #5? (Per Figure 3.2 or only MR#2) <br /> Systems, or Perforated Stub-out Figure 3.3 in Appendix No additional <br /> Connections 1 of the 2013-2018 requirements <br /> • BMP T5.11 or T5.12: Concentrated Flow WWA Phase II Permit <br /> Dispersion or Sheet Flow Dispersion &Phase I Permit). <br /> NOT REQUIRED: Achievement of the LID No(the project triggered <br /> Performance Standard.Applying the other Yes only MRs#1 -#9) <br /> BMPs in List#1 or List#2. V <br /> Is the project inside the UGA? <br /> Did the project developer choose to meet <br /> the LID Performance Standard? Yes v No <br /> Is the project on a parcel <br /> NO of 5 acres or larger? <br /> REQUIRED: <br /> IV <br /> each Did the project developer No <br /> surface, consider the choose to meet the LID VYes <br /> BMPs in the order Performance Standard? REQUIRED: Meet the LID <br /> listed in List#1 for that Performance Standard through <br /> type of surface. Use Yes the use of any BMP(s)in the <br /> the first BMP that is 2014 SWMMWW except for <br /> considered feasible. Yes No Rain Gardens (the use of <br /> Bioretention is acceptable). <br /> NOT REQUIRED: <br /> Achievement of the LID V If the project can't meet the <br /> Performance Standard. REQUIRED: For each LID Performance Standard, it <br /> V surface, consider the BMPs must seek and be granted an <br /> REQUIRED: Meet the LID Performance in the order listed in List#2 exception/variance. <br /> Standard through the use of any BMP(s) in for that type of surface. Use <br /> the 2014 SWMMWW except for Rain Gardens the first BMP that is REQUIRED: Apply BMP T5.13 <br /> (the use of bioretention is acceptable). considered feasible. Post-Construction Soil Quality <br /> and Depth. <br /> REQUIRED for Projects Triggering MR#1-9*: NOT REQUIRED: <br /> Apply BMP T5.13 Post Construction Soil Achievement of the LID NOT REQUIRED:Applying the <br /> Quality and Depth. Performance Standard. BMPs in List#1 or List#2. <br /> NOT REQUIRED:Applying the BMPs in List <br /> #1 or List#2. *Recommended by Ecology for projects triggering MRs#1 -#5. <br /> li .,llEill Figure 1-2.5.1 <br /> III Flow Chart for Determining LID MR #5 <br /> illWil Requirements <br /> PARTMENT OF <br /> Revised June 2015 <br /> ECOLOGY Please see http://www.ecy.wa.govJcopyright.html for copyright notice including permissions, <br /> State of Washington limitation of liability, and disclaimer. <br />