My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:20:34 PM
Creation date
6/15/2020 11:14:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Does the project discharge to Flow Control Exempt Waters(per Minimum Requirement(MR)#7)? <br /> Eyes _ <br /> REQUIRED: Implement the following BMPs NO <br /> where feasible: <br /> • BMP T5.13: Post-Construction Soil Quality ♦ No(the <br /> and Depth Does the project project <br /> • BMP T5.10A, B, or C: Downspout Full trigger only MRs#1 - triggered <br /> Infiltration, Downspout Dispersion #5? (Per Figure 3.2 or only MR#2) <br /> Systems, or Perforated Stub-out Figure 3.3 in Appendix No additional <br /> Connections 1 of the 2013-2018 requirements <br /> • BMP T5.11 or T5.12: Concentrated Flow WWA Phase II Permit <br /> Dispersion or Sheet Flow Dispersion &Phase I Permit). <br /> NOT REQUIRED: Achievement of the LID No(the project triggered <br /> Performance Standard.Applying the other Yes only MRs#1 -#9) <br /> BMPs in List#1 or List#2. V <br /> Is the project inside the UGA? <br /> Did the project developer choose to meet <br /> the LID Performance Standard? Yes v No <br /> Is the project on a parcel <br /> NO of 5 acres or larger? <br /> REQUIRED: <br /> IV <br /> each Did the project developer No <br /> surface, consider the choose to meet the LID VYes <br /> BMPs in the order Performance Standard? REQUIRED: Meet the LID <br /> listed in List#1 for that Performance Standard through <br /> type of surface. Use Yes the use of any BMP(s)in the <br /> the first BMP that is 2014 SWMMWW except for <br /> considered feasible. Yes No Rain Gardens (the use of <br /> Bioretention is acceptable). <br /> NOT REQUIRED: <br /> Achievement of the LID V If the project can't meet the <br /> Performance Standard. REQUIRED: For each LID Performance Standard, it <br /> V surface, consider the BMPs must seek and be granted an <br /> REQUIRED: Meet the LID Performance in the order listed in List#2 exception/variance. <br /> Standard through the use of any BMP(s) in for that type of surface. Use <br /> the 2014 SWMMWW except for Rain Gardens the first BMP that is REQUIRED: Apply BMP T5.13 <br /> (the use of bioretention is acceptable). considered feasible. Post-Construction Soil Quality <br /> and Depth. <br /> REQUIRED for Projects Triggering MR#1-9*: NOT REQUIRED: <br /> Apply BMP T5.13 Post Construction Soil Achievement of the LID NOT REQUIRED:Applying the <br /> Quality and Depth. Performance Standard. BMPs in List#1 or List#2. <br /> NOT REQUIRED:Applying the BMPs in List <br /> #1 or List#2. *Recommended by Ecology for projects triggering MRs#1 -#5. <br /> li .,llEill Figure 1-2.5.1 <br /> III Flow Chart for Determining LID MR #5 <br /> illWil Requirements <br /> PARTMENT OF <br /> Revised June 2015 <br /> ECOLOGY Please see http://www.ecy.wa.govJcopyright.html for copyright notice including permissions, <br /> State of Washington limitation of liability, and disclaimer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.