My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:20:34 PM
Creation date
6/15/2020 11:14:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT —bate Applied: 4/20/2018 <br /> #0.. City of Everett Permit Services Public Works Permit#: PW1804-043 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> 1101444 ," <br /> Everett,WA 98201 Planning Reference#: PREAPP18-005 <br /> (425)257-8810 Public Works Fee: $396.30 <br /> 05 SEP 1018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> COSTCO WHOLESALE CORP COSTCO WHOLESALE CORP <br /> 999 LAKE DR 999 LAKE DR <br /> ISSAQUAH, WA, 98027 ISSAQUAH, WA, 98027 <br /> PHONE: 4254277540 PHONE: 4254277540 <br /> TAX PARCEL ID#: 28051900101000 SITE ADDRESS: 10200 19TH AVE SE <br /> DESCRIPTION: SITE WORK FOR EXPANSION OF COSTCO FUELING FACILITY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed';in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 8/15/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 prior to starting construction for a <br /> consultation and to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requested. See the <br /> attached handout for phone number and online instructions to Request an Inspection. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or <br /> easements and the improvements located therein. <br /> 10. This permit must be finaled'in order to close out this permit. Call the inspection line to request a Final for this permit <br /> when all items have been completed. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control $200.00 I Int 1 <br /> Grade/Fill/Excavate (325CY) $110.00 SEEP _ <br /> Paving (46.30SF) $46.30 5 <br /> 2018 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 CITY OF EVERET <br /> Permit Services T <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> 9 / y The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everettfrom any and all claims for damages,costs, <br /> ff ~-/ f U /d' expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date - –;:42tb <br /> Approved as Constructed (PW Inspector) Sigrature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE P MIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.