Laserfiche WebLink
Costco Loc.No.114/Our Job No.6226.11 <br /> From: Michael Brick <br /> Sent: Thursday,April 12, 2018 10:41 AM <br /> To: Grace Pollard<GPollard@a,everettwa.gov> <br /> Subject: Costco Fueling Traffic Mitigation Estimate <br /> Grace, <br /> Based on my review of the trip generation study prepared by Kittelson&Associates, Inc. I accept the estimate <br /> of 14 net new PM Peak trips for the expansion of the existing Costco fueling station from 16 to 24 positions. If <br /> traffic mitigation was calculated today this project would owe$33,600. I have attached a PDF showing the fee <br /> calculation if you want a copy for your file. Please let me know if you have any questions, or if you need <br /> additional info from me on this project. <br /> Michael G. Brick, P.E. <br /> Associate Engineer <br /> Public Works/Traffic Engineering <br /> P: 425.257.7790 / C:425.328.0641 <br /> E <br />