My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:20:34 PM
Creation date
6/15/2020 11:14:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Project Information <br /> Project/Site Name: Costco Fuel Facility— Everett, WA <br /> Street/Location: 10200 19th Ave SE <br /> City: Everett State: WA Zip code: 98208 <br /> 1.1 Existing Conditions <br /> Total acreage (including support activities such as off-site equipment staging yards, material <br /> storage areas, borrow areas). <br /> Total acreage: 0.66 <br /> Disturbed acreage: 0.20 <br /> Existing structures: Project site is currently a Costco Fuel Facility with 8 Dispenser islands. <br /> Landscape topography: The site is largely flat with slopes ranging from 2-5%. <br /> Drainage patterns: The existing drainage patterns are such that stormwater sheet flows in <br /> various directions towards on-site drainage structures. <br /> Existing Vegetation: The site has some existing vegetation consisting of mostly landscape <br /> planters <br /> Critical Areas (wetlands, streams, high <br /> erosion risk, steep or difficult to stabilize Site is not located in nor does it contain <br /> slopes): any critical areas worth mentioning. <br /> 1.2 Proposed Construction Activities <br /> Description of site development (example: subdivision): <br /> The project proposes to construct a new approximately 3,960-square-foot fueling canopy <br /> expansion with four (4) pump island dispensers. The site will be largely surrounded with <br /> impervious concrete/asphalt pavement. Improvements to the access on Highway 527, as well as <br /> a new controller enclosure will be built in conjunction with the fuel facility expansion. <br /> Description of construction activities (example: site preparation, demolition, excavation): <br /> Construction activities will include demolition and disposing of on-site asphalt and concrete. <br /> Subsequently after the demolition phase, excavation will occur for proposed structures. Such <br /> preparation will include regrading in order to install the proposed improvements. <br /> Description of site drainage including flow from and onto adjacent properties. Must be <br /> consistent with Site Map in Appendix A: <br /> The project site is fully developed, and all existing stormwater flow is contained and routed to its <br /> own private stormwater facilities. The proposed disturbed area will not alter the drainage patterns <br /> Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.