2.1.5 Element 5: Stabilize Soils <br /> West of the Cascade Mountains Crest <br /> Season Dates Number of Days Soils Can <br /> be Left Exposed <br /> During the Dry Season May 1 —September 30 7 days <br /> During the Wet Season October 1 —April 30 2 days <br /> Soils must be stabilized at the end of the shift before a holiday or weekend if needed based on <br /> the weather forecast. <br /> Anticipated project dates: Start date: TBD End date: TBD <br /> Will you construct during the wet season? <br /> TBD <br /> List and describe BMPs: Soils exposed and unworked for the time period specified above <br /> shall be stabilized with the application of effective BMPs to prevent erosion throughout the <br /> duration of the project. Soil stockpiles shall be stabilized or covered using plastic sheeting and <br /> where possible, located away from storm inlets, waterways, and drainage channels. Refer to <br /> Appendix B for detailed drawings of the BMPs used. The proposed BMPs specific to Soil <br /> Stabilization are: <br /> • BMP C123: Plastic Covering <br /> Installation Schedules: BMPs shall be implemented as soon as land disturbing activity begins <br /> and installed where applicable for the duration of the project. <br /> Inspection and Maintenance plan: TBD <br /> Responsible Staff: TBD <br /> Page 110 <br />