My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:20:34 PM
Creation date
6/15/2020 11:14:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 Reporting and Record Keeping <br /> 6.1 Record Keeping <br /> 6.1.1 Site Log Book <br /> A site log book will be maintained for all on-site construction activities and will include: <br /> • A record of the implementation of the SWPPP and other permit requirements <br /> • Site inspections <br /> • Sample logs <br /> 6.1.2 Records Retention <br /> Records will be retained during the life of the project and for a minimum of three (3) years <br /> following the termination of permit coverage in accordance with Special Condition S5.0 of the <br /> CSWGP. <br /> Permit documentation to be retained on-site: <br /> • CSWGP <br /> • Permit Coverage Letter <br /> • SWPPP <br /> • Site Log Book <br /> Permit documentation will be provided within 14 days of receipt of a written request from <br /> Ecology. A copy of the SWPPP or access to the SWPPP will be provided to the public when <br /> requested in writing in accordance with Special Condition S5.G.2.b of the CSWGP. <br /> 6.1.3 Updating the SWPPP <br /> The SWPPP will be modified if: <br /> • Found ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. <br /> • There is a change in design, construction, operation, or maintenance at the construction <br /> site that has, or could have, a significant effect on the discharge of pollutants to waters <br /> of the State. <br /> The SWPPP will be modified within seven (7) days if inspection(s) or investigation(s) determine <br /> additional or modified BMPs are necessary for compliance. An updated timeline for BMP <br /> implementation will be prepared. <br /> Page 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.