My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/02/11 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/02/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 11:19:05 AM
Creation date
6/15/2020 11:17:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/11/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Eight multifamily housing units in the Downtown urban center, twenty multifamily housing <br /> units in the E-1 MUO urban centers, and twenty multifamily housing units in the North <br /> Broadway urban center; or <br /> • <br /> • <br /> • <br /> b. Four multifamily housing units in a building in which all residential units are located abo o, <br /> the ground floor in a building containing a minimum of four thousand square f ct of commercial <br /> space on the ground floor; or <br /> eb. Eight units of rehabilitated multifamily housing;provided,that conversion of buildings <br /> originally constructed as single-family dwellings to multiple-family dwellings shall not be . <br /> eligible for the property tax exemption provided herein; and further provided,that existing <br /> multifamily housing that has been vacant for twelve months or more does not have to provide <br /> additional»nits so long as the project provides at least eight units of rehabilitated multifamily <br /> housing. <br /> 4. Permanent Residential Housing.At least fifty percent of the space designated for <br /> multifamily housing must be provided for permanent residential occupancy,as defined in <br /> Section 3.78.030(J)and only that portion of the space designated for multifamily housing shall <br /> be eligible for the exemption provided for herein. <br /> 5. Proposed Completion Date.New construction multifamily housing and rehabilitation • <br /> improvements must be completed within.three years from the date of approval of the application, <br /> plus any extension of time granted under Section 3.78.090(B). <br /> 6. Compliance with Guidelines and Standards.The project must be designed to comply with <br /> the city's comprehensive plan,building,housing and zoning codes, design guidelines,and any <br /> other applicable regulations in effect at the time the applicant submits a fully completed <br /> application to the director.For the duration of the exemption granted under this chapter,the <br /> property shall have no violations of applicable zoning requirements,land use regulations,or <br /> building and housing ordinance requirements for which a notice of violation has been issued and <br /> • is not resolved by compliance,withdrawal or other final resolution. The project must also <br /> comply with any other standards and guidelines adopted by the city for the residential targeted <br /> area in which the project will be developed. <br /> 7. Off-Street Parking. <br /> a. The project must provide all required parking spaces on site,unless otherwise specifically <br /> authorized by the city council as a pilot program or demonstration project, or as may be allowed <br /> by a master plan adopted under the Institutional Overlay Zone as provided by EMC Chapter <br /> 19.33 h. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.