My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10010 23RD AVE W 2020-06-15
>
Address Records
>
23RD AVE W
>
10010
>
10010 23RD AVE W 2020-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 11:41:07 AM
Creation date
6/15/2020 11:40:12 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD AVE W
Street Number
10010
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICIVORKS PERMIT InCate Applied: 6/20/2019 <br /> City of Everett Permit Services Public Works Permit#: PW1906-054 <br /> EVERETT 3200 Cedar Street, 2nd Floor Parent Code Case#: CE19-0175 <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $45.00., JUN 2019 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: Lof 4f <br /> CHASE LAURA L CHASE LAURA L <br /> 14615 CASCADIAN WAY UNIT 1 14615 CASCADIAN WAY UNIT 1 <br /> LYNNWOOD,WA,98087 LYNNWOOD,WA,98087 <br /> PHONE:4256785060 PHONE:4256785060 <br /> TAX PARCEL ID#:00538200004100 SITE ADDRESS: 10010 23RD AVE W <br /> DESCRIPTION: REMOVE UNPERMITTED GRAVEL AND PARKING PER CE19-0175 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Removed unpermitted gravel from site per Hearing Examiner Order. <br /> 5. Permanently remove unpermitted parking of vehicles and equipment from site per Hearing Examiner Order. <br /> 6.All conditions of Hearing Examiner Order per CE19-0175 must be met. <br /> 7. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 8. Install and maintain erosion control measures per City of Everett Standards as needed per the direction of the Public Works <br /> Inspector. Remove upon completion of the project prior to final approval of the permit. <br /> 9. Keep City streets clean at all times. No dirt,mud, rocks,or debris to be tracked onto roadway. <br /> 10. Protect all existing underground utilities during construction. <br /> 11. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br /> managed on-site in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements <br /> and the improvements located therein. <br /> 12. Don Cunningham with the City of Everett Code Enforcement shall perform a final inspection to close out the Code Case CE19-0175 <br /> prior to final of the Public Works Permit. <br /> 13.This permit must be finaled in order to close out this permit. Request a final inspection online by selecting PW 24-Site Final within <br /> the Online Permitting Portal Inspection Requests for this permit when all items have been completed. aisle ® <br /> Public Works Permit Fee Breakdown: <br /> Misc. Minor Permit $25.00 JUN 2 0 20'9 <br /> PW Site Inspection $20.00 <br /> CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> 7s.za/20the City of Everett from any and all claims for damages,costs,expenses,or <br /> causes of action that may arise because of installation and maintenance of <br /> Approved for Construction(Public Works) Date the improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace public <br /> proper y damaged t b <br /> FINAL INSPECTION Date <br /> Approved as Constructed(PW Inspector) Signature of Applicant D/21/ <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> q <br />
The URL can be used to link to this page
Your browser does not support the video tag.