Laserfiche WebLink
t <br /> • I <br /> a. Eight multifamily housing units in the Downtown urban center,twenty multifamily housing <br /> units in the E-1 MUO urban centers and twen multifamil housin units in the North <br /> Broadway urban center; or <br /> sixtee-en.the-greund-flee r . <br /> eb. Eight units of rehabilitated multifamily housing;provided,that conversion of buildings <br /> originally constructed as single-family dwellings to multiple-family dwellings shall not be <br /> • <br /> eligible for the property tax exemption provided heeinoll�further ore doesnot have to provide <br /> rovided,that existing . <br /> multifamily housing that has been vacant for twelve <br /> additional units so long as the project provides at least eight units of rehabilitated multifamily <br /> housing. • <br /> 4. Permanent Residential Housing.At least fifty percent of the space designated for <br /> multifamily housing must be provided for permanent residential occupancy,as defined in <br /> Section 3.78.030(i)and only that portion of the space desijiated for multifamily housing shall <br /> be eligible for the exemption provided for herein. <br /> 5. Proposed Completion Date.New construction multifamily housing and rehabilitation <br /> • <br /> improvements must be completed within three years from the date of approval of the application, . <br /> plus any extension of time granted under Section 3.78.090(B). • <br /> 6. Compliance with Guidelines and Standards.The project must be designed to comply with <br /> the city's comprehensive plan,building,housing and zoning codes, design guidelines,and any <br /> other applicable regulations in effect at the time the applicant submits a fully completed <br /> the <br /> application to the director.For the duration of the exemption grantedunder <br /> chapter, <br /> property shall have no violations of applicable zoning requirements,land use regulations,or <br /> building and housing ordinance requirements for which a notice of violation has been issued and <br /> is not resolved by compliance,withdrawal or other final resolution.The project must also <br /> comply with any other standards and guidelines adopted by the city for the residential targeted <br /> area in which the project will be developed. <br /> 7. Off-Street Parking. <br /> a. The project must provide all required parking spaces on site,unless otherwise specifically <br /> authorized b the ci council as a ilot ro aim or demonstration ro.ec or as ma be allowed <br /> b a master lan ado ted under the Institutional Overla Zone as rovided b EMC Cha ter <br /> 19.33B. <br /> 1 <br /> 1 'l <br />