Laserfiche WebLink
3EOTECHNICAL ENGINEERING STUDY <br /> =ostco Wholesale <br /> c/o Barghausen Consulting Engineers E-8556 <br /> January 13, 1999 Page 12 <br /> Asphalt concrete (AC), asphalt-treated base (ATB), and crushed rock base (CRB) materials <br /> should conform to WSDOT specifications. Rock base should be compacted to at least 95 <br /> percent of the ASTM D-1557 laboratory test standard. <br /> LIMITATIONS <br /> Our recommendations and conclusions are based on the site materials observed, selective <br /> laboratory testing and engineering analyses, the design information provided to us by you, and <br /> our experience and engineering judgement. The conclusions and recommendations are <br /> professional opinions derived in a manner consistent with that level of care and skill ordinarily <br /> exercised by other members of the profession currently practicing under similar conditions in <br /> this area. No warranty is expressed or implied. <br /> The recommendations submitted in this report are based upon the data obtained from the <br /> exploratory borings. Soil and groundwater conditions between borings may vary from those <br /> ncountered. The nature and extent of variations between our exploratory locations may not <br /> Wecome evident until construction. If variations do appear, ECI should be requested to <br /> reevaluate the recommendations of this report and to modify or verify them in writing prior <br /> to proceeding with the construction. <br /> Additional Services <br /> We recommend that ECI be retained to perform a general review of the final design and <br /> specifications to verify that the earthwork and foundation recommendations have been <br /> properly interpreted and implemented in the design and in the construction specifications. <br /> We also recommend that ECI be retained to provide geotechnical services during construction. <br /> This is to observe compliance with the design concepts, specifications or recommendations <br /> and to allow design changes in the event subsurface conditions differ from those anticipated <br /> prior to the start of construction. We do not accept responsibility for the performance of the <br /> foundation or earthwork unless we are retained to review the construction drawings and <br /> specifications, and to provide construction observation and testing. <br /> Earth Consultants, inc. <br />