Laserfiche WebLink
9/10/2019 Page <br /> City of Everett <br /> 1:51:08PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1712-009 Site Address 1610 63RD ST SE <br /> Applied 12/12/2017 Applicant Lot <br /> Approved 2/28/2018 Owner YAY SOPHAN Block <br /> Issued 3/5/2018 Contractor SOPHAN'S NEW&GEN HOME REPAIR Tract <br /> Parent Permit No. Description ADDING ROOM ABOVE GARAGE <br /> Notes <br /> Scheduled Completed Tvne Inspector . Result Remarks Inspector's Comments <br /> 4/17/2018 4/17/2018 BLDG DWF APPROVAL OK for concrete <br /> 02-FOOTING/SETB <br /> 4/17/2018 4/17/2018 BLDG DWF APPROVAL OK for concrete <br /> 03-FOUNDATION <br /> 4/18/2018 4/18/2018 ELEC 08-OTHER SKB OTHER VOIDED(JMN Obtain an electrical work permit. <br /> 7/23/2018) Properly secure and support and protect <br /> NM/SER cables and boxes. <br /> Replace all home runs as they have been <br /> exposed to excessive rain water and <br /> sunlight. <br /> • Make the job site safe. <br /> 7/23/2018 7/23/2018 PLUMB SDP CORRECTION Replumb waste-n-vents for bathroom--Left <br /> 03-ROUGH IN drawing. <br /> 7/23/2018 7/23/2018 BLDG DWF PARTIAL APPR Leave plumbing/mechanical open for <br /> 08-FRAMING inspection.Framing not ready.Need shear <br /> nailing first so electrical can be installed. <br /> 8/30/2018 8/30/2018 BLDG DWF CORRECTION Shear nailing-plans not complete. <br /> 07-EXTERIOR No"wall type"call outs? <br /> Shear schedule? <br /> Or arch/engineering letter for nailing <br /> schedule etc. <br /> 8/31/2018 8/31/2018 MECH 04-ROUGH SDP APPROVAL As noted Fan OK as noted: <br /> IN Insulate the duct to R-4. <br /> 8/31/2018 8/31/2018 PLUMB SDP APPROVAL As noted Methods/materials are OK.Glue fittings, <br /> 03-ROUGH IN fill tub and test waste for leaks. <br /> 8/31/2018 8/31/2018 BLDG TMB CORRECTION 1.Simpson strong walls installed and ready <br /> 07-EXTERIOR for cover. <br /> 2.Touch up nailing and blocking at panel <br /> edges at shear walls. <br /> 9/4/2018 9/4/2018 BLDG DWF CORRECTION Not ready--needs shear nailing before <br /> 08-FRAMING framing inspection. <br /> 10/12/2018 10/12/2018 BLDG DWF APPROVAL OK to cover <br /> 07-EXTERIOR <br /> 10/12/2018 10/12/2018 BLDG DWF APPROVAL OK to cover <br /> 10-INTERIOR <br /> 3/5/2019 3/6/2019 BLDG DWF PARTIAL APPR Phone:425-773-1835 <br /> 08-FRAMING <br /> (3/5/2019 9:35 AM DWF) <br /> Framing-partial approval,need to install <br /> anchor bolts as per plan in garage,ok to <br /> insulate the rest of house. <br /> 4/5/2019 4/5/2019 BLDG KMK APPROVAL <br /> 08-FRAMING <br /> 4/5/2019 4/5/2019 BLDG KMK APPROVAL <br /> 09-DRYWALL <br /> 4/5/2019 4/5/2019 BLDG KMK APPROVAL <br /> 11-INSULATION <br /> 7/18/2019 7/18/2019 MECH 06-FINAL DXW APPROVAL (7/18/2019 1:15 PM DXW) <br /> 1 bath exh.ok mech.final. <br /> 7/18/2019 7/18/2019 PLUMB 06-FINAL DXW APPROVAL 425-773-1835 <br /> INSP12 <br /> CRWs <br />