My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
507 74TH ST SW 2020-06-15
>
Address Records
>
74TH ST SW
>
507
>
507 74TH ST SW 2020-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 1:59:55 PM
Creation date
6/15/2020 1:59:42 PM
Metadata
Fields
Template:
Address Document
Street Name
74TH ST SW
Street Number
507
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/1/2019 page 1 <br /> City of Everett ;2, <br /> ' <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. BW1810-006 Site Address 507 74TH ST SW <br /> Applied 10/19/2018 Applicant Lot <br /> Approved 12/26/2018 Owner TODD CELIA R Block <br /> Issued 3/1/2019 Contractor OWNER Tract <br /> Parent Permit No. PW 1811-057 Description DECK AND PATIO COVER CONSTRUCTED W/O PERMITS <br /> Notes (11/29/2018 11:09 AM TRN) <br /> PERMIT CONDITIONS: 1.Downspouts shall discharge to splash blocks.2.Erosion control measures <br /> shall be installed.3.No dirt,etc.to be tracked onto roadway. <br /> Scheduled Completed TVDe Inspector Result Remarks Inspector's Comments <br /> 3/28/2019 3/28/2019 BLDG 15-FINAL KMK CORRECTION (3/25/2019 3:43 PM KMK) <br /> KMK changed Inspection Date/Time from <br /> 03/25/2019 to 03/26/2019 <br /> (3/26/2019 3:33 PM KMK) <br /> KMK changed Inspection Date/Time from <br /> 03/26/2019 to 03/28/2019 <br /> (3/28/2019 3:26 PM KMK) <br /> Partial inspection: <br /> 1.Back deck:please complete stairs per <br /> code(see plans) <br /> 2.Please have plans on site for next <br /> inspection <br /> 5/16/2019 5/16/2019 BLDG 15-FINAL KMK CORRECTION (5/15/2019 3:35 PM KMK) <br /> kmk changed Inspection Date/Time from <br /> 05/15/2019 to 05/16/2019 <br /> (5/16/2019 3:55 PM KMK) <br /> 1.Please complete stairs off back deck to <br /> code or block with guard rail. <br /> 2.Plans call for 2X10 rafters and blocking <br /> 4'oc.Please fix or provide alternate <br /> engineering.Also ledger is not attached to <br /> house per plan. <br /> Note:Number 2 correction on 5/16 is in <br /> regard to the'shed roof.(see plans) <br /> 6/20/2019 6/20/2019 . BLDG 15-FINAL TMB CORRECTION See Notes (6/20/2019 3:47 PM TMB) <br /> CORRECTIONS REQUIRED: <br /> 1.Ledger bolts missing and overspaced @ <br /> house(see plan)@ Deck and @ Patio roof. <br /> 2.Handrail(gripable)missing @ Steps. <br /> (see plan) <br /> 3.Guard spacing exceeds 4"inches.(see <br /> plan) <br /> 4.Provide stair riser boards (per plan) <br /> 5.Covered roof area extends into the 5 ft <br /> sideyard setback.(See Plans) <br /> 6.Covered roof area(rafters are smaller <br /> than approved design(plans show 2"by 10" <br /> @ 16"oc. <br /> Have 2"by 6"@ 24"oc.) <br /> 7.Post beam connectors @ patio roof not <br /> completed both sides of connections. <br /> 6/24/2019 6/24/2019 BLDG KMK CORRECTION see notes (6/24/2019 8:20 AM KMK) <br /> 01-CONSULTATIO Left phone message: <br /> Please complete all corrections and <br /> complete project per plan. <br /> Recall when work is completed. <br /> INSPI2 CRWsYSUMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.