|
rifliCOMcheck Software Version 4.0.8.1
<br /> g *I ' Mechanical Compliance Certificate
<br /> Project Information
<br /> Energy Code: 2015 IECC
<br /> Project Title: Panda Express
<br /> Location: Everett,Washington
<br /> Climate Zone: 4c
<br /> Project Type: Alteration
<br /> Construction Site: Owner/Agent: Designer/Contractor:
<br /> CFT Plaza Evergreen Way CRM Architects& Planners Inc.
<br /> Evergreen Way&Casino Road 5921 Folsom Blvd.
<br /> Everett, WA 98208 Saramento, CA 95819
<br /> (916)451-1500
<br /> Mechanical Systems List
<br /> Quantity System Type&Description
<br /> 1 HVAC System 1 (Single Zone):
<br /> Heating:1 each-Central Furnace,Gas,Capacity=115 kBtu/h
<br /> Proposed Efficiency=82.00%Et,Required Efficiency=80.00%Et
<br /> Cooling: 1 each-Single Package DX Unit,Capacity=57 kBtu/h,Air-Cooled Condenser,Air Economizer
<br /> Proposed Efficiency=15.20 SEER,Required Efficiency: 14.00 SEER
<br /> Fan System: FAN SYSTEM 1 I Restroom&Support--Compliance(Motor nameplate HP method):Passes
<br /> Fans:
<br /> FAN 1 Supply,Constant Volume,2000 CFM, 1.2 motor nameplate hp,0.0 fan efficiency grade
<br /> FAN 2 Exhaust,Constant Volume,450 CFM,0.2 motor nameplate hp,0.0 fan efficiency grade
<br /> FAN 10 Return,Constant Volume, 1500 CFM,1.2 motor nameplate hp,0.0 fan efficiency grade
<br /> 1 HVAC System 2(Single Zone):
<br /> Heating: 1 each-Central Furnace,Gas,Capacity=180 kBtu/h
<br /> Proposed Efficiency=82.00%Et,Required Efficiency=80.00%Et
<br /> Cooling: 1 each-Single Package DX Unit,Capacity=111 kBtu/h,Air-Cooled Condenser,Air Economizer
<br /> Proposed Efficiency=11.50 EER,Required Efficiency: 11.00 EER +12.6 IEER
<br /> Fan System: FAN SYSTEM 2 I Dining&Kitchen--Compliance(Motor nameplate HP method):Passes
<br /> Fans:
<br /> FAN 3 Supply,Constant Volume,4000 CFM,1.5 motor nameplate hp,0.0 fan efficiency grade
<br /> FAN 4 Return,Constant Volume,3250 CFM, 1.5 motor nameplate hp,0.0 fan efficiency grade
<br /> FAN 6 Exhaust,Constant Volume,3450 CFM, 1.5 motor nameplate hp,0.0 fan efficiency grade
<br /> 1 HVAC System 3(Single Zone):
<br /> Heating: 1 each-Central Furnace,Gas,Capacity=180 kBtu/h
<br /> Proposed Efficiency=82.00%Et,Required Efficiency=80.00%Et
<br /> Cooling: 1 each-Single Package DX Unit,Capacity=111 kBtu/h,Air-Cooled Condenser,Air Economizer
<br /> Proposed Efficiency=11.50 EER,Required Efficiency: 11.00 EER +12.6 IEER
<br /> Fan System: FAN SYSTEM 3 I Dining&Kitchen--Compliance(Motor nameplate HP method):Passes
<br /> Fans:
<br /> FAN 7 Supply,Constant Volume,4000 CFM, 1.5 motor nameplate hp,0.0 fan efficiency grade
<br /> FAN 8 Return,Constant Volume,3250 CFM, 1.5 motor nameplate hp,0.0 fan efficiency grade
<br /> FAN 9 Exhaust,Constant Volume,3400 CFM, 1.5 motor nameplate hp,0.0 fan efficiency grade
<br /> 1 Make Up Air Unit(Single Zone):
<br /> Heating: 1 each-Central Furnace,Gas,Capacity=344 kBtu/h
<br /> Proposed Efficiency=80.00%Et,Required Efficiency=80.00%Et
<br /> Project Title: Panda Express Report date: 03/16/18
<br /> Data filename: \\Coruscant\i\A-PROJECTS\T-24-Projects\2018 Proj\1891.cck Page 1 of...le
<br />
|