My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2126 112TH PL SE 2020-06-15
>
Address Records
>
112TH PL SE
>
2126
>
2126 112TH PL SE 2020-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 3:03:26 PM
Creation date
6/15/2020 3:02:56 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH PL SE
Street Number
2126
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/12/2019 City of Everett Page i <br /> 11:29:50AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1707-022 Site Address 2126 112TH PL SE <br /> Applied 7/12/2017 Applicant Peter Anderson Lot <br /> Approved 12/21/2017 Owner SILVER LAKE TOWNHOMES LLC Block <br /> Issued 3/2/2018 Contractor M V M DEVELOPMENT&CONST INC Tract <br /> Parent Permit No. PW 1704-048 Description NEW TOWNHOUSE-UNIT 15 BLDG E <br /> Notes PLANNING INSPECTION NEEDED BEFORE FINAL/CONTACT GRACE POLLARD 425-257-8807 <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 3/26/2018 3/26/2018 BLDG 04-UFER KMK APPROVAL Received <br /> GROUND engineering for pin <br /> piles <br /> 3/26/2018 3/26/2018 BLDG KMK APPROVAL Received <br /> 02-FOOTING/SETB engineering for pin <br /> piles <br /> 3/29/2018 3/29/2018 BLDG KMK APPROVAL OK to pour <br /> 03-FOUNDATION <br /> 4/12%2018 4/12/2018 PLUMB DXW APPROVAL As noted Hard cap 4x2 fitting <br /> 02-GROUND <br /> 9/13/2018 9/13/2018 PLUMB DXW APPROVAL As noted On top floor vent for kitchen sink to vent 6" <br /> 03-ROUGH IN above flood level of shower picture required <br /> of fixture. <br /> 10/30/2018 10/30/2018 MECH 04-ROUGH DXW APPROVAL As noted Light and plug required in attic at furnace <br /> IN <br /> 10/31/2018 10/31/2018 BLDG KMK CORRECTION Provide special inspection report R/E <br /> 08-FRAMING 5.1.1.9.1 <br /> OK to insulate pending above correction. <br /> 11/9/2018 11/9/2018 BLDG KMK PARTIAL APPR OK to add shear <br /> 11-INSULATION walls <br /> 11/15/2018 11/15/2018 BLDG 13-OTHER KMK APPROVAL Provide insulation <br /> cert at final <br /> 4/24/2019 4/24/2019 MECH 06-FINAL DXW APPROVAL eTRAKiT Inspection 4/23/2019 4:59 PM Daniel Gedalia <br /> Request <br /> Contact Name:Daniel Gedalia <br /> Site Address:2126 112TH PLSE <br /> Phone:8187441473 <br /> e-Mail:dannygedalia@gmail.com <br /> 4/24/2019 4/24/2019 PLUMB 06-FINAL DXW CORRECTION eTRAKiT Inspection 4/23/2019 4:59 PM Daniel Gedalia <br /> Request <br /> Contact Name:Daniel Gedalia <br /> Site Address:2126 112TH PLSE <br /> Phone:8187441473 <br /> e-Mail:dannygedalia@gmail.com <br /> (4/24/2019 11:49 AM DXW) <br /> Ford fitting req.at water serve and take <br /> kink out of water serv. <br /> secure water pipe at HWT. <br /> proper rated fire door at P.R.V.and water <br /> shut off. <br /> 4/29/2019 4/29/2019 PLUMB 06-FINAL DXW APPROVAL eTRAKiT Inspection 4/26/2019 9:25 PM Daniel Gedalia <br /> Request <br /> Contact Name:Daniel Gedalia <br /> Site Address:2126 112TH PLSE <br /> Phone:8187441473 <br /> e-Mail:dannygedalia@gmail.com <br /> INSP12 <br /> CRWS TES <br />
The URL can be used to link to this page
Your browser does not support the video tag.