My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2202 112TH PL SE 2020-06-15
>
Address Records
>
112TH PL SE
>
2202
>
2202 112TH PL SE 2020-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 3:50:19 PM
Creation date
6/15/2020 3:49:56 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH PL SE
Street Number
2202
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/28/2019 Page 1 <br /> 10:32:15AM City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1707-021 Site Address 2202 112TH PL SE <br /> Applied 7/12/2017 Applicant Peter Anderson Lot <br /> Approved 12/27/2017 Owner SILVER LAKE TOWNHOMES LLC Block <br /> Issued 2/7/2018 Contractor M V M DEVELOPMENT&CONST INC Tract <br /> Parent Permit No, PW 1704-048 Description NEW TOWNHOUSE-UNIT 14 BLDG D <br /> Notes PLANNING INSPECTION REQUIRED PRIOR TO FINAL. CONTACT GRACE POLLARD <br /> 425-257-8807 <br /> SCHOOL MITIGATION FEES ON PERMIT C1707-019 <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 2/8/2018 2/8/2018 BLDG KMK APPROVAL Building D <br /> 02-FOOTING/SETB <br /> 2/16/2018 2/16/2018 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 3/8/2018 3/8/2018 PLUMB DXW APPROVAL <br /> 02-GROUND <br /> 6/27/2018 6/27/2018 BLDG KMK APPROVAL See special <br /> 07-EXTERIOR inspection <br /> 8/8/2018 8/8/2018 PLUMB DXW CORRECTION Use ford fitting on <br /> 03-ROUGH IN service in wall <br /> 8/10/2018 8/10/2018 PLUMB DXW APPROVAL <br /> 03-ROUGH IN <br /> 8/27/2018 8/27/2018 MECH 04-ROUGH DXW APPROVAL <br /> IN <br /> 8/30/2018 8/30/2018 BLDG KMK PARTIAL APPR See special 1.Complete electrical inspection. <br /> 08-FRAMING inspection 2.Recall for pre-rock and insulation <br /> inspection <br /> 9/6/2018 9/6/2018 BLDG 13-OTHER KMK CORRECTION 1.Provide special inspection for all framing <br /> to include all details per plan(RE S1.19.1) <br /> before cover. <br /> 2.OK to cover party wall pending#1. <br /> 9/26/2018 9/26/2018 SPECIAL KMK APPROVAL Framing <br /> INSPECTION <br /> 9/26/2018 9/26/2018 BLDG KMK APPROVAL Pre-rock <br /> 08-FRAMING <br /> 5/8/2019 5/8/2019 PERMIT CRB APPROVAL RAN OUT OF TIME <br /> EXTENSION <br /> 5/10/2019 5/10/2019 PLUMB 06-FINAL SDP NOT READY eTRAKiT Inspection 5/9/2019 5:49 AM Daniel Gedalia <br /> Request <br /> Contact Name:Daniel Gedalia <br /> Site Address:2202 112TH PL SE <br /> Phone:8187441473 <br /> e-Mail:dannygedalia@gmail.com <br /> (5/10/2019 7:40 AM SDP) <br /> Recall the inspection when the mechanical <br /> is ready for final. <br /> 5/14/2019 5/14/2019 PLUMB 06-FINAL DXW APPROVAL eTRAKiT Inspection 5/13/2019 7:38 PM Daniel Gedalia <br /> Request <br /> Contact Name:Daniel Gedalia <br /> Site Address:2202 112TH PL SE <br /> Phone:8187441473 <br /> e-Mail:dannygedalia@gmail.com <br /> 5/14/2019 5/14/2019 MECH 06-FINAL DXW APPROVAL eTRAKiT Inspection 5/13/2019 7:38 PM Daniel Gedalia <br /> Request <br /> Contact Name:Daniel Gedalia <br /> Site Address:2202 112TH PL SE <br /> Phone:8187441473 <br /> e-Mail:dannygedalia@gmail.com <br /> INSP12 CRIOVsYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.