My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2212 112TH PL SE 2020-06-16
>
Address Records
>
112TH PL SE
>
2212
>
2212 112TH PL SE 2020-06-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:20:48 AM
Creation date
6/16/2020 8:20:24 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH PL SE
Street Number
2212
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7/10/2019 Page 1 <br /> City of Everett <br /> 9:03:30AM <br /> INSPECTION ACTIVITY REPORT 2 <br /> Permit No. C1707-016 Site Address 2212 112TH PL SE BLDG C-10 <br /> Applied 7/12/2017 Applicant Peter Anderson Lot <br /> Approved 12/14/2017 Owner SILVER LAKE TOWNHOMES LLC Block <br /> Issued 1/26/2018 Contractor M V M DEVELOPMENT&CONST INC Tract <br /> Parent Permit No. PW 1704-048 Description NEW TOWNHOUSE-UNIT 10 BLDG C <br /> Notes PLANNING INSPECTION NEEDED BEFORE FINAL/CONTACT GRACE POLLARD 425-257-8807 <br /> SCHOOL IMPACT FEE'S ON PERMIT C 1707-014 <br /> Scheduled Completed Type Insuector Result Remarks Inspector's Comments <br /> 2/14/2018 2/14/2018 BLDG 04-UFER KMK APPROVAL <br /> GROUND <br /> 2/14/2018 2/14/2018 BLDG KMK APPROVAL <br /> 02-FOOTING/SETB <br /> 2/27/2018 2/27/2018 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 3/13/2018 3/13/2018 PLUMB DXW APPROVAL <br /> 02-GROUND <br /> 8/23/2018 8/23/2018 PLUMB DXW APPROVAL As noted 1st floor lavatory to have studor vent at <br /> 03-ROUGH IN final under cabinet and complete fix on <br /> leak. <br /> 9/10/2018 9/10/2018 MECH 04-ROUGH DXW APPROVAL <br /> IN <br /> 9/19/2018 9/19/2018 BLDG KMK CORRECTION 1.Complete special inspection from <br /> 08-FRAMING S1.1/9.1 before cover(wood framing). <br /> 2.Ground floor-complete anchor bolts per <br /> plan. <br /> 3.OK to insulate 2md and 3rd floor only. <br /> 4.Complete fire blocking at soffits and <br /> above panels. <br /> 9/25/2018 9/25/2018 BLDG KMK CORRECTION Please provide complete special inspection <br /> 08-FRAMING report from S 1.1/9.1(wood framing) <br /> Do Not Cover <br /> 9/26/2018 9/26/2018 SPECIAL KMK APPROVAL Framing <br /> INSPECTION <br /> 10/5/2018 10/5/2018 BLDG KMK CORRECTION Not ready <br /> 11-INSULATION <br /> 10/11/2018 10/11/2018 BLDG KMK APPROVAL <br /> 11-INSULATION <br /> 5/7/2019 5/7/2019 PERMIT CRB APPROVAL RAN OUT OF TIME <br /> EXTENSION <br /> 5/7/2019 5/7/2019 PLUMB 06-FINAL TMB APPROVAL <br /> 5/7/2019 5/7/2019 MECH 06-FINAL TMB APPROVAL <br /> 5/16/2019 5/16/2019 BLDG 15-FINAL KMK CORRECTION eTRAKiT Inspection 5/14/2019 6:47 PM Daniel Gedalia <br /> Request <br /> Contact Name:Daniel Gedalia <br /> Site Address:2212 112TH PL SE BLDG <br /> C-10 <br /> Phone:8187441473 <br /> e-Mail:dannygedalia@gmail.com <br /> (5/15/2019 2:45 PM KMK) <br /> kmk changed Inspection Date/Time from <br /> 05/15/2019 to 05/16/2019 <br /> (5/16/2019 3:47 PM KMK) <br /> 1.Obtain final from fire department <br /> 2.Obtain planning final <br /> 3.Obtain public works final <br /> 4.Complete electrical(exterior and gate) <br /> and obtain final <br /> INSP12 CI?WSYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.