My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2214 112TH PL SE 2020-06-16
>
Address Records
>
112TH PL SE
>
2214
>
2214 112TH PL SE 2020-06-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:26:10 AM
Creation date
6/16/2020 8:25:43 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH PL SE
Street Number
2214
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7/10/2019 Page 1 <br /> City of Everett <br /> 9:04:11AM '"L <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1707-017 Site Address 2214 112TH PL SE BLDG C-11 <br /> Applied 7/12/2017 Applicant Peter Anderson Lot <br /> Approved 12/14/2017 Owner SILVER LAKE TOWNHOMES LLC Block <br /> Issued 1/26/2018 Contractor M V M DEVELOPMENT&CONST INC Tract <br /> Parent Permit No. PW 1704-048 Description NEW TOWNHOUSE-UNIT 11 BLDG C <br /> Notes PLANNING INSPECTION NEEDED BEFORE FINAL/CONTACT GRACE POLLARD 425-257-8807 <br /> SCHOOL IMPACT FEES ON PERMIT C1707-014 <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 2/14/2018 2/14/2018 BLDG KMK APPROVAL <br /> 02-FOOTING/SETB <br /> 2/14/2018 2/14/2018 BLDG 04-UFER KMK APPROVAL <br /> GROUND <br /> 2/27/2018 2/27/2018 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 3/13/2018 3/13/2018 PLUMB DXW APPROVAL <br /> 02-GROUND <br /> 8/23/2018 8/23/2018 PLUMB DXW APPROVAL As noted 1st floor lavatory to have studor vent at <br /> 03-ROUGH IN final. <br /> 8/24/2018 8/24/2018 PLUMB DXW APPROVAL No studor vent <br /> 03-ROUGH IN required at final <br /> 9/10/2018 9/10/2018 MECH 04-ROUGH DXW APPROVAL <br /> IN <br /> 9/19/2018 9/19/2018 BLDG KMK CORRECTION 1.Complete special inspection from <br /> 08-FRAMING S1.1/9.1 before cover(wood framing). <br /> 2.Ground floor-complete anchor bolts per <br /> plan. <br /> 3.OK to insulate 2nd and 3rd floor only. <br /> 4.Complete fire blocking at soffits and <br /> above panels. <br /> 9/25/2018 9/25/2018 BLDG KMK CORRECTION Please provide complete special inspection <br /> 08-FRAMING report from S1.1/9.1(wood framing) <br /> Do Not Cover <br /> 9/26/2018 9/26/2018 SPECIAL KMK APPROVAL Framing <br /> INSPECTION <br /> 10/5/2018 10/5/2018 BLDG KMK CORRECTION Not ready <br /> 11-INSULATION <br /> 10/11/2018 10/11/2018 BLDG KMK APPROVAL <br /> 11-INSULATION <br /> 5/7/2019 5/7/2019 EXPIRATION CRB APPROVAL RAN OUT OF TIME <br /> LETTER <br /> 5/7/2019 5/7/2019 PLUMB 06-FINAL TMB APPROVAL <br /> 5/7/2019 5/7/2019 MECH 06-FINAL TMB APPROVAL <br /> 5/8/2019 5/8/2019 PERMIT CRB APPROVAL RAN OUT OF TIME <br /> EXTENSION <br /> INSP12 CRW'SYSTEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.