My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2220 112TH PL SE 2020-06-16
>
Address Records
>
112TH PL SE
>
2220
>
2220 112TH PL SE 2020-06-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:42:50 AM
Creation date
6/16/2020 8:42:27 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH PL SE
Street Number
2220
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/28/2019 page <br /> City of Everett <br /> 10:36:03AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1707-012 Site Address 2220 112TH PL SE#B-6 <br /> Applied 7/11/2017 Applicant Peter Anderson Lot <br /> Approved 11/28/2017 Owner SILVER LAKE TOWNHOMES LLC Block <br /> Issued 4/4/2018 Contractor M V M DEVELOPMENT&CONST INC Tract <br /> Parent Permit No. PW 1704-048 Description NEW TOWNHOUSE-UNIT 6 BLDG B <br /> Notes PLANNING INSPECTION REQUIRED PRIOR TO FINAL. CONTACT GRACE POLLARD <br /> 425-257-8807 <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 4/5/2018 4/5/2018 BLDG KMK APPROVAL Provide geo <br /> 02-FOOTING/SETB <br /> 4/5/2018 4/5/2018 BLDG 04-UFER KMK APPROVAL Provide geo <br /> GROUND <br /> 4/11/2018 4/11/2018 BLDG KMK APPROVAL <br /> 11-INSULATION <br /> 4/25/2018 4/25/2018 PLUMB DXW APPROVAL As noted Complete fix on broken fitting. <br /> 03-ROUGH IN <br /> 10/17/2018 10/17/2018 PLUMB DXW APPROVAL Complete test on <br /> 03-ROUGH IN back vent <br /> 12/4/2018 12/4/2018 BLDG KMK CORRECTION Not ready <br /> 08-FRAMING <br /> 12/5/2018 12/5/2018 BLDG KIvIK APPROVAL See report <br /> 08-FRAMING <br /> 12/6/2018 12/6/2018 BLDG KMK PARTIAL APPR Insulation at party <br /> 11-INSULATION wall ok to cover <br /> 12/20/2018 12/20/2018 BLDG KMK CORRECTION (12/20/2018 3:50 PM KMK) <br /> 11-INSULATION Call for mechanical inspection. <br /> Remove insulation where necessary for <br /> inspection. <br /> 12/21/2018 12/21/2018 MECH 04-ROUGH DXW APPROVAL <br /> IN <br /> 5/8/2019 5/8/2019 PERMIT CRB APPROVAL RAN OUT OF TIME <br /> EXTENSION <br /> 5/29/2019 5/29/2019 PLUMB 06-FINAL DXW NOT READY eTRAKiT Inspection 5/29/2019 12:00 AM Daniel Gedalia <br /> Request <br /> Contact Name:Daniel Gedalia <br /> Site Address:2220 112TH PL SE#B-6 <br /> Phone:8187441473 <br /> e-Mail:dannygedalia@gmail.com <br /> 5/29/2019 5/29/2019 MECH 06-FINAL DXW APPROVAL eTRAKiT Inspection 5/29/2019 12:00 AM Daniel Gedalia <br /> Request <br /> Contact Name:Daniel Gedalia <br /> Site Address:2220 112TH PL SE#B-6 <br /> Phone:8187441473 <br /> e-Mail:dannygedalia@gmail.com <br /> 5/31/2019 5/31/2019 PLUMB 06-FINAL DXW APPROVAL eTRAKiT Inspection 5/30/2019 1:51 PM Daniel Gedalia <br /> Request <br /> Contact Name:Daniel Gedalia <br /> Site Address:2220 112TH PL SE#B-6 <br /> Phone:8187441473 <br /> e-Mail:dannygedalia@gmail.com <br /> 6/6/2019 6/6/2019 BLDG 15-FINAL KMK APPROVAL eTRAKiT Inspection 6/5/2019 7:57 PM Daniel Gedalia <br /> Request <br /> Contact Name:Daniel Gedalia <br /> Site Address:2220 112TH PL SE#B-6 <br /> Phone:8187441473 <br /> e-Mail:dannygedalia@gmail.com <br /> 6/6/2019 6/6/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 6/14/2019 6/19/2019 CERTIFICATE OF PTEC APPROVAL <br /> OCCUPANCY <br /> INSP12 aillirs YSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.