My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4805 BAYVIEW LN 2020-06-16
>
Address Records
>
BAYVIEW LN
>
4805
>
4805 BAYVIEW LN 2020-06-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 11:05:35 AM
Creation date
6/16/2020 11:04:07 AM
Metadata
Fields
Template:
Address Document
Street Name
BAYVIEW LN
Street Number
4805
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to <br /> control the quality of stormwater discharges. <br /> Whenever inspection and/or monitoring reveals that the BMPs identified in the <br /> Construction SWPPP are inadequate, due to the actual discharge of or potential to <br /> discharge a significant amount of any pollutant, appropriate BMPs or design changes shall <br /> be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the site. <br /> The SWPPP shall be modified whenever there is a change in the design, construction, <br /> operation, or maintenance at the construction site that has, or could have, a significant <br /> effect on the discharge of pollutants to waters of the state. <br /> The SWPPP shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that <br /> the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include <br /> additional or modified BMPs designed to correct problems identified. Revisions to the <br /> SWPPP shall be completed within seven days following inspection. <br /> 13: Protect LID BMPs <br /> Since this project does not propose to construct any infiltration BMPs no site-specific area <br /> needs to be flagged or protected during grading/construction. However, once the site soils <br /> have been amended to meet the requirements of BMP T5.13 those areas shall be <br /> protected from any heavy equipment traffic and only minimal foot traffic and light <br /> equipment if necessary, for spreading of final stabilization materials should be allowed. <br /> 5. SOURCE CONTROL <br /> This project proposes to construct a new SFR and driveway. Per Volume 1 of the City of <br /> Everett 2010 Stormwater Management Manual residential development does not require <br /> source control. <br /> 6. PRESERVATION OF NATURAL DRAINAGE SYSTEM <br /> The runoff from the site improvements will be dispersed on-site. However, by not grading <br /> or compacting the majority of the pervious surfaces to remain after construction in the area <br /> of disturbance a maximum amount of site runoff from the developed project will be <br /> absorbed and infiltrated into the existing on-site soils. This will mimic the existing <br /> conditions by maintaining the existing direction and condition of flow from this site. <br /> Bayview SFR 18-0806 <br /> August2018 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.