Laserfiche WebLink
OMEGA2707 Wetmore Avenue <br /> Everett, WA 98201 <br /> ENGINEERING, INC. t 425.387.3820 <br /> f 425-259.1958 <br /> December 18, 2018 <br /> City of Everett, Public Works <br /> Thad Newport <br /> Hand Delivered <br /> RE: Response Letter for Bayview Lane— PW 1809-017 <br /> Dear Staff, <br /> This letter is intended to summarize the changes made to the engineering package submitted <br /> for the permit review for this project. This letter addresses comments the County provided in <br /> their letter dated August 27, 2018 along with the redline markups. I have tried to format this <br /> letter to match the comment letter for easier understanding. <br /> Plan Revisions <br /> 1) The comments provided on the mark-ups from the City Staff have been addressed exactly <br /> how the comment directed. <br /> Drainage Report <br /> 1) The report has been updated to reference the DOE SWMMWW. <br /> 2) The SWPPP Narrative has been updated to remove the reference to the existing paved <br /> driveway and direct the contactor to install a construction entrance. <br /> 3) The reference to retaining a vegetative strip has been removed, however, it is always an <br /> acceptable approach to retain vegetation, even temporarily, along the downslope side of the <br /> improvements/disturbance until much of the site has been stabilized. <br /> 4) Element 13 added with appropriate discussion for this project. <br /> Thank you for taking the time to review the revised plans and report for this project. Please feel <br /> free to contact me with any questions you may have. <br /> eel <br /> J seph Smeby, P.E. <br /> Project Engineer <br />