Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> October 14, 2019 <br /> Owner: Smith <br /> Job Address: 2602 Cleveland Ave <br /> Plan Check No: C1706-011 <br /> RE: Building Permit Review Letter <br /> Dear Mr.Smith, <br /> In response to the revised plans submitted for the modified front porch and due to the Planning department <br /> restrictions,the plans have been examined and you are advised that revisions are necessary before the <br /> revisions can be approved. Please review and respond to the comments below. <br /> 1. Please provide the Building Department with revised drawings reflecting the changes made to the <br /> upper front porch and columns supporting the roof over the front porch,located on the east side of <br /> the structure.The revised drawings shall include: <br /> - framing plans for the upper balcony 5 ct. f I I ' <br /> -a section drawing of the upper balcony showing joist attachment to the structure ` ".` <br /> ee -knee brace construction and attachment -tv- Mux-c. 604V: <br /> -attachment of the guard to the structure —p t.R tS la's �( <br /> -Post to footing connection ptuk,C p� e <br /> -Post to beam connection f <br /> 2. Provide gravity,wind and seismic calculations for the columns supporting the roof over the front <br /> Porches. Eu.q}ri c.e -5 <br /> 3. Revise second Floor plan to show additional space over garage. Label this space as"Uninhabitable <br /> Storage Only". If this space is heated, indicate level of insulation in walls floor and ceiling.If it is <br /> unheated provide insulated door between the living space and storage area. 5r t, <br /> ter` <br /> 4. Revise second floor plan to show two windows and a door in the front elevation.pu A5 ()19y.4 <br /> 5. Provide verification from the engineer of record that the reduction in shear walls on the east <br /> elevation does not change the requirements for lateral bracing. J6. £,n.40,4,¢4< <br /> In order for the processing of your application to continue,it will be necessary to provide the Building Division <br /> with two new sets of revised construction documents reflecting the corrections requested. Please include a <br /> response letter which indicates how the corrections were resolved. <br /> P-a§e I of 2- <br />