My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1601 FLORIDA DR Geotech Report 2022-10-25
>
Address Records
>
FLORIDA DR
>
1601
>
Geotech Report
>
1601 FLORIDA DR Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:33:48 PM
Creation date
6/16/2020 3:14:43 PM
Metadata
Fields
Template:
Address Document
Street Name
FLORIDA DR
Street Number
1601
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r , <br /> 3.2 Calculate the infiltration rate for each 15-minute interval (change in depth at each <br /> interval x 4) and record the results in the table below. <br /> Time of * Depth to Infiltration <br /> Measure Water vel Rate <br /> (15-min. interval} (inchesLe) (in/hr) <br /> ( 8: Zi 5-WS <br /> t�$ <br /> :3‘ (o-W 3, <br /> I$: 5 f -7/ ca <br /> 8 2,© <br /> t4:4P6 z. <br /> (Q: z I '-r./S Z. <br /> 4. Check for high groundwater/immediate groundwater mounding: <br /> 4.1 Within 24 hours after the falling head period, excavate the botto •w•f the pit. <br /> 4.2 Is standing water or seepage visible in excavated hole? (Yes No) <br /> 4.3 If yes", record depth : ft. <br /> 5. Data Analysis/"Measured Infiltration Rate"Selection (use the falling head data to confirm <br /> the measured infiltration rate calculated from the steady-state data): <br /> 5.1 Steady-state measured infiltration rate: Provide the lowest infiltration rate from steady- <br /> state table above: Z.6q in/hr. <br /> 5.2 Select"Measured Infiltration Rate": Z a 0 in/hr <br /> 5.3 If the lowest measured infiltration rate is less than the minimum rate associated with <br /> an infiltration BMP, that BMP cannot be used. <br /> 5.4 If the measured infiltration rate is less than all minimum infiltration rates for infiltration <br /> BMPs, no further investigation is required. <br /> 6. Calculate "Design Infiltration Rate": The design infiltration rate shall be calculated by applying <br /> the appropriate correction factor to the above measured infiltration rate. <br /> 6.1 Select a correction factor. <br /> Site variability and number of locations tested, CF„= b.45 <br /> Uncertainty of test method, CFt= 0.5 <br /> Degree of influent control to prevent siltation and bio-buildup, CFm = <br /> Total correction factor= CFv x CFt x CFm = ©. 2 <br /> 6.2 Calculate the Design Infiltration Rate below: <br /> Design Infiltration Rate = 4.2' x 2.cs = p,55 in/hr <br /> Infiltration Test performed by: Print Name ,4. 5. kJ <br /> Signature _,. Date $/z3/2o11 <br /> Company i -tU 45sOcad►4ec, vtc.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.