Laserfiche WebLink
September 10, 2017 <br /> Infiltration Tests <br /> L&A Job No. 17-095 <br /> Page 7 <br /> sequences or procedures, except as specifically described in this report for design <br /> considerations. <br /> Our recommendations and conclusions are based on subsurface conditions encountered in <br /> the exploratory and infiltration test pits, our engineering analyses, and our experience and <br /> engineering judgment. The conclusions and recommendations are professional opinions <br /> derived in a manner consistent with the level of care and skill ordinarily exercised by <br /> other members of the profession currently practicing under similar conditions in this area. <br /> No warranty, expressed or implied, is made. <br /> The actual subsurface conditions encountered during construction may vary from those <br /> encountered in the test pits. The nature and extent of such variations may not become <br /> evident until construction starts. If variations occur then, we should be retained to re- <br /> evaluate the recommendations of this report, and to verify or modify them in writing prior <br /> to proceeding further with the construction work. <br /> CLOSURE <br /> We are pleased to be of service to you on this project. Please feel free to contact us if you <br /> have questions regarding this report or need further consultation. <br /> LIU & ASSOCIATES, INC. <br />