Laserfiche WebLink
`JBLLIC WORK <br /> Item Unit I Quantity Unit Price Amount <br /> Construction Storm Drainage <br /> Temporary Silt Fence L.F. 1,110 5.00 � 9- <br /> Grading for drainage swales L.F. 2.00 /� <br /> Other <br /> Other <br /> Construction Storm Drainage Total $ 2050. <br /> Clearing & Grading <br /> 12"wide area L.F. 2.50 <br /> Right-of-Way L.F. 12.00 <br /> Other (total net cut/fill) C.Y. l CI I See EMC J 230- 00 �/ <br /> GO <br /> 13.80.010 .F$ �,5, ©-0 — a?7-S <br /> Clearing and Grading Total: c ��, ,,l' •"0,•"0,;F t aqs,sts <br /> 0I <br /> e. ; <br /> COST EST FEE CALC-2016 <br />