My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 GLENWOOD AVE 2020-06-17
>
Address Records
>
GLENWOOD AVE
>
6300
>
6300 GLENWOOD AVE 2020-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 8:27:08 AM
Creation date
6/17/2020 8:14:05 AM
Metadata
Fields
Template:
Address Document
Street Name
GLENWOOD AVE
Street Number
6300
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Rim Environmental Inc. a ac:Rim6510 Southcenter Blvd. Suite 40 <br /> Seattle, WA 98188 <br /> (206)244-8965 www.PacRimEnv.com <br /> Inspection Summary <br /> Project Information <br /> Job Number 16467 <br /> Project Name South Everett CADMAN Plant <br /> Project Address: 6300 Glenwood Avenue <br /> Client: Lehigh Hanson <br /> Date of Survey: 20-Oct-2018 <br /> PacRim Technician: Tyler Sadler <br /> Limitations: Buildings included in Survey <br /> Item 1: Former Redi-Mix Warehouse <br /> Item 4 and 5: Batch Plant <br /> Item 6: Batch Tower <br /> Item 7: Former Color Mix Building <br /> Item 9: Pre-Stress Building and QC Lab <br /> Exterior Photo: <br /> • <br /> as <br /> Turnaround Requested: 3-5 Days <br /> Page 1/28 <br /> This report shall not be reproduced, except in full, without written permission from Pacific Rim Environmental, Inc. <br /> PacRim Project Number 16467 <br />
The URL can be used to link to this page
Your browser does not support the video tag.