My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 GLENWOOD AVE 2020-06-17
>
Address Records
>
GLENWOOD AVE
>
6300
>
6300 GLENWOOD AVE 2020-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 8:27:08 AM
Creation date
6/17/2020 8:14:05 AM
Metadata
Fields
Template:
Address Document
Street Name
GLENWOOD AVE
Street Number
6300
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Rim Environmental, Inc. <br /> BULK SAMPLE ANALYSIS REPORT <br /> CLIENT: Lehigh Hanson PACRIM#: 16467 <br /> 6300 Glenwood Avenue REPORT#: 2018-10-0156 <br /> Everett, WA DATE RECEIVED: 10/22/2018 <br /> ANALYST: Sandra H. Rice Et William F. Golloway <br /> PROJECT: South Everett CADMAN Plant DATE ANALYZED: 10/22/2018 &t 10/23/2018 <br /> 6300 Glenwood Avenue REPORT BY: Allison Lewis <br /> Everett, WA REPORT DATE: 10/24/2018 <br /> TURNAROUND: 3-5 Days <br /> SAMPLE DATE: 10/20/218 PAGE: 5 of 12 <br /> Client/Lab ID Sample Asbestos Type(s)/% Other Material(s) Analyzed <br /> Number Location. and DescriptionAnalyzed <br /> 16 Batch tower, 2nd floor, Chrysotile 3-5% Cellulose (1-3%), Polyethylene 10/22/18 <br /> west area (Popcorn Foam, Binder, Mineral <br /> 2018-10-0171 Ceiling Texture) Aggregate. Analyst: <br /> SHR <br /> White fibrous popcorn <br /> ceiling texture with white <br /> paint. <br /> 17 Batch tower, 2nd floor, Layer 1 (Mastic): Layer 1: Cellulose (1-3%), 10/22/18 <br /> west area on perimeter None Detected. Binder, Mineral Aggregate. <br /> 2018-10-0172 wall(Cove Base Mastic) Analyst: <br /> Layer 2 (Texture): Layer 2: Cellulose (<1%), SHR <br /> Tan flexible cove base Chrysotile 1-3% Binder, Mineral Aggregate. <br /> mastic (layer 1) on light <br /> pink/off white watt <br /> texture with light <br /> green/white paint (layer <br /> 2). <br /> 18 Batch tower, 2nd floor, Chrysotile 1-3% Cellulose (<1%). 10/22/18 <br /> west wall between wall <br /> 2018-10-0173 and column (Expansion Analyst: <br /> Joint) SHR <br /> White flexible <br /> caulk/sealant with light <br /> green/light grey paint. <br /> 19 Batch tower, 2nd floor, Layer 1 (Caulk): Layer 1: Cellulose (<1%), 10/22/18 <br /> west entryway(Door None Detected. Binder, Mineral Aggregate. <br /> 2018-10-0174 Frame Caulk) Analyst: <br /> Layer 2 (Texture): Layer 2: Cellulose (<1%), SHR <br /> Grey flexible caulk (layer Chrysotile 1-3% Binder, Mineral Aggregate. <br /> 1)on white wall texture <br /> with white/light green Layer 3 (Substrate): Layer 3: Cellulose (90-95%), <br /> paint (layer 2) on brown None Detected. Binder, Mineral Aggregate. <br /> woody substrate (layer 3). <br /> This report shall not be reproduced,except in full,without written permission from Pacific Rim Environmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.