My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 GLENWOOD AVE 2020-06-17
>
Address Records
>
GLENWOOD AVE
>
6300
>
6300 GLENWOOD AVE 2020-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 8:27:08 AM
Creation date
6/17/2020 8:14:05 AM
Metadata
Fields
Template:
Address Document
Street Name
GLENWOOD AVE
Street Number
6300
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.--„, Pacific Rim Environmental Inc. <br /> ) 0 I <br /> 6510 Southcenter Blvd. Suite 40 <br /> --,, , ,5 ac im Seattle, WA 98188 <br /> (206)244-8965 www.PacRimEnv.com <br /> Lead-Based Paint (XRF) Data Sheet <br /> Client: Lehigh Hanson XRF Serial#: 80662 <br /> Project: South Everett CADMAN Plant Inspection Date: 20-Oct-2018 <br /> Project Address: 6300 Glenwood Avenue Inspection By: Tyler Sadler <br /> Reviewed by: Allison Lewis Pacrim Job# 16467 <br /> Sample# Calibration Substrate Component/Side Description/Location Color Result* Pbc mg/cm2 <br /> 1 Yes Positive 1.1 <br /> 2 Yes Positive 1.1 <br /> 3 Yes Positive 1.1 <br /> 4 Concrete Vertical column Batch tower,2nd floor,east wall White Negative 0 <br /> 5 Concrete Horizontal column Batch tower,2nd floor,east wall White Negative 0 <br /> 6 Wood Door frame Batch tower,2nd floor,east wall White Negative 0.04 <br /> 7 Wood Door jamb Batch tower,2nd floor,east wall Blue Negative 0 <br /> 8 Wood Window frame Batch tower,2nd floor,east wall White Negative 0.01 <br /> 9 Concrete Wall Batch tower,2nd floor, north wall Grey Negative 0 <br /> 10 Cocnrete Column Batch tower,2nd floor, north wall White Negative 0 <br /> 11 Drywall Wall Batch tower,2nd floor,center dividing wall White Negative 0 <br /> 12 Metal Door Batch tower,2nd floor,west wall Grey Negative 0 <br /> 13 Metal Handrail Batch tower,exterior,west wall Red Negative 0.02 <br /> 14 Metal Stair stringer Batch tower,exterior,west end Red Negative 0.06 <br /> 15 Metal Stairway support beam Batch tower,exterior,west end Red Negative 0.01 <br /> Page 1/2 <br /> *HUD standard is 1.0 mg/cm2 WISHA standard is any amount of lead is considered lead containing material - <br /> This report shall not be reproduced,except in full,without written permission from Pacific Rim Environmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.