My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
330 HEATHER RD 2020-06-17
>
Address Records
>
HEATHER RD
>
330
>
330 HEATHER RD 2020-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 8:53:36 AM
Creation date
6/17/2020 8:53:12 AM
Metadata
Fields
Template:
Address Document
Street Name
HEATHER RD
Street Number
330
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/30/2019 Page 1 <br /> City of Everett <br /> 11:33:27AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1901-069 Site Address 330 HEATHER RD <br /> Applied 1/11/2019 Applicant Lot <br /> Approved 1/11/2019 Owner HALLGARTH CONSTANCE A&BRIAN H Block <br /> Issued 1/11/2019 Contractor MCGINTY ELECTRIC CO INC Tract <br /> Parent Permit No. C1811-007 Description REWIRE EXTG HOME COMPLETE WITH(1)200AMP OVRHD <br /> Notes <br /> Scheduled Completed 'I'vDe Inspector Result Remarks Inspector's Comments <br /> 1/16/2019 1/16/2019 ELEC 05-SERVICE SKB APPROVAL As noted AM inspection requested <br /> (1/16/2019 10:45 AM SKB) <br /> Run a number fourcopper or equivalent to <br /> the metal water pipe that is a grounding <br /> electrode the 10 feet outside the building <br /> line.Only one lane circuit and one <br /> receptacle circuit wiring at this time. <br /> 5/10/2019 5/10/2019 ELEC 06-ROUGH SKB PARTIAL APPR Mike <br /> IN 425-308-0693 <br /> (5/10/2019 11:47 AM SKB) <br /> Front and rear outside soffits only <br /> (5/10/2019 12:00 PM SKB) <br /> Front and rear soffit only <br /> 5/30/2019 5/31/2019 ELEC 06-ROUGH MCB APPROVAL Mike 425-308-0693 <br /> IN <br /> 8/26/2019 8/26/2019 ELEC 06-ROUGH SKB APPROVAL Phone:425-299-0116 <br /> IN <br /> (8/26/2019 2:49 PM SKB) <br /> skb changed Inspection Type from ELEC <br /> 09-FINAL to ELEC 06-ROUGH IN <br /> (8/26/2019 2:49 PM SKB) <br /> Master bathroom floor heat. <br /> 10/29/2019 10/29/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 10/29/2019 10/29/2019 ELEC 09-FINAL TRA APPRVD-PERK 425-299-0116 <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.