My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2814 HEWITT AVE NOODLE NATION 2022-02-11
>
Address Records
>
HEWITT AVE
>
2814
>
NOODLE NATION
>
2814 HEWITT AVE NOODLE NATION 2022-02-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 4:01:19 PM
Creation date
6/17/2020 8:56:32 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
2814
Tenant Name
NOODLE NATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2015 WSEC Compliance Forms for Commercial Buildings including R2, R3, & R4 over 3 stories and all R1 Revised Jun 2016 <br />Project Title: Noodle Nation <br />Date 09/07/2017 <br />Fenestration Area as % gross above -grade wall area Max. Target: 30.0% <br />For Building Department Use <br />Skylight Area as % gross roof area Max. Target: 3. 096 <br />If vertical fenestration or skylight area exceeds maximum allowed per C402.4.1, then the project must comply <br />via Component Performance and provide ENV-UA and ENV-SHGC forms. <br />Building Component <br />R-Value Method for <br />U-Factor/F-Factor Method for <br />Prescriptive Compliance <br />Prescriptive Compliance <br />Perim. Ins. Full Slab Cl <br />Provide plan/detail # of assembly and description <br />R-Value R-Value <br />F-Factor F-Factor Sourcet0 <br />o <br />j <br />a <br />m <br />a) <br />I <br />(6 <br />m <br />c <br />- <br />o <br />-o <br />2 <br />Ins. <br />Assembly <br />Provide ID from door schedule and description <br />R-Value <br />U-Factor <br />U-Factor Source' <br />ti <br />c' <br />Steel door (ELEV. A) <br />o <br />o <br />C7 <br />§ <br />0 <br />W <br />1 <br />U) <br />m <br />a� <br />O= <br />O <br />i <br />Solar Heat Gain Coefficient (SHGC) <br />U-Factor for Prescriptive Compliance <br />rolec ion <br />Orientation <br />Factor (PF) <br />(N or <br />Assembly <br />Assembly <br />Provide ID from window schedule and description <br />if applicable'Z <br />SEW)13 <br />SHGC14 <br />U-Factor <br />U Factor Source'4 <br />m <br />' <br />c <br />0 <br />Z <br />c <br />0 <br />70 <br />o <br />x <br />i <br />C: <br />m <br />ti <br />� <br />0-Overhead <br />door w/temp. glass (ELEV. B) <br />If <br />>a� <br />Z <br />c <br />0 <br />g <br />Cm <br />T <br />a <br />� <br />~ <br />Y <br />ii <br />Q <br />Note 1 - Insulation that is continuous except for fasteners may be entered here if the cross -sectional area of metal penetration through otherwise <br />continuous insulation is less than 0.12%. <br />Note 2 - Alternate prescriptive continuous insulation R-values per Table C402.1.4, Footnote F may be used if the cross sectional area of metal <br />penetrations exceeds 0.04% but is less than 0.12%. Calculations are required to use these alternate R-values. <br />Note 3 -Opaque assembly U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. Specify the <br />table number or calculation page number. <br />Note 4 - Thermal spacer blocking and liner system are required for prescriptive R-Value compliance in metal building roof assemblies. <br />Note 5 - Intermediate framing is required for prescriptive R-Value compliance in wood -framed wall assemblies. <br />Note 6 - Proposed CMU mass walls in non -Group R that meet Table C402.1.4 Footnote D requirements can enter the target prescriptive <br />U-value of 0.104. <br />Note 7 - Mass transfer slab edges must be covered with an assembly having an overal U-factor of 0.2. <br />Note 8 - Refer to Table C402.1.3, Footnote E for prescriptive R- Value requirement for steel floor joist assemblies. <br />Note 9 -Prescriptive slab -on -grade insulation shall extend from top of slab to minimum length per an approved method as defined in C402.2.6. <br />Note 10 - Slab -on -grade F-Factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. <br />Note 11- Opaque door U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. A door is defined as <br />opaque if less than 50% of the door area has glazing. <br />Note 12 - Refer to Equation C4-6 Projection Factor Calculation. <br />Note 13 - N = Oriented within 45 degrees of true north, SEW = All other orientations. <br />Note 14 - Fenestration assembly U-Factor and SHGC shall be the manufacturer's NFRC product rating, which includes the glazing and frame, or <br />shall be the default value per Section C303.1.3. <br />Note 15 - List all above -grade Group R mass walls and steel frame walls in Group R Walls section. List commercial above grade walls and all other <br />Group R above grade walls in Opaque Walls -Above Grade. <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.